APN Research Brief: Seize Pauls Dairy for 2032 Olympic Workforce Hub

APN Research — 2032 Olympics Workforce & Infrastructure

APN Research Brief: Seize Pauls Dairy for 2032 Olympic Workforce Hub

This Cabinet-Level Acquisition Brief is submitted to the Department of the Premier and Cabinet to advocate for the urgent and immediate state intervention in the sale of the property located at 108 Montague Road, South Brisbane. Formerly the operational headquarters and production facility for Lactalis Australia (Pauls Dairy), this 1.697-hectare site is currently “under contract” to private interests, poised for conversion into high-density residential towers under the permissive Kurilpa Temporary Local Planning Instrument (TLPI).1

1Executive Summary

This Cabinet-Level Acquisition Brief is submitted to the Department of the Premier and Cabinet to advocate for the urgent and immediate state intervention in the sale of the property located at 108 Montague Road, South Brisbane. Formerly the operational headquarters and production facility for Lactalis Australia (Pauls Dairy), this 1.697-hectare site is currently “under contract” to private interests, poised for conversion into high-density residential towers under the permissive Kurilpa Temporary Local Planning Instrument (TLPI).1

The central thesis of this brief is that the standard redevelopment model for South Brisbane, luxury residential densification, represents a strategic failure in the context of the forthcoming Brisbane 2032 Olympic and Paralympic Games. The State faces a catastrophic construction workforce shortfall, projected to peak at 50,000 workers by 2026-27.3 This labour deficit threatens to derail the delivery of critical Olympic infrastructure, inflate capital works budgets through hyper-escalation of wages, and leave a legacy of debt rather than capacity.

Accordingly, this proposal recommends the acquisition of 108 Montague Road to establish the Kurilpa Construction & Technology Campus (KCTC). This facility is envisioned as a world-class “Living Lab” for advanced construction training, modern methods of construction (MMC), and large-scale infrastructure simulation. By securing this site, the Government creates a sovereign capability asset that directly addresses the greatest risk to the 2032 Games: the inability to physically build the required venues on time and on budget due to a lack of skilled human capital.

The Convergence of Crisis and Opportunity

The argument for acquisition rests on the intersection of three critical timelines: the imminent closure of the Lactalis factory in July 20264, the escalation of the Olympic infrastructure programme, and the acute housing supply crisis.

Independent analysis by Construction Skills Queensland (CSQ) and the Queensland Audit Office confirms that the state’s construction pipeline will surge from $53 billion to $77 billion by 2026-27.3 This 45% increase in activity coincides with a structural hollowing out of the skilled trades sector. The traditional mechanisms of workforce development, regional TAFEs and remote training centres, are insufficient to generate the volume and calibre of specialised labour required for complex Olympic venues like the new Brisbane Arena or the refurbished Gabba precinct.

The KCTC proposal rejects the binary choice between “derelict industry” and “luxury apartments.” Instead, it champions Strategic State Highest and Best Use (HBU). While the market valuation of the site is driven by its potential for 90-storey residential towers6, the strategic value to the State of a facility that can produce 2,000 job-ready tradespeople annually far exceeds the one-off stamp duty revenue from private development.

The Site as a Sovereign Asset

108 Montague Road is not merely a generic development parcel; it is a strategic keystone. It contains significant industrial heritage, specifically the 1944 Art Deco administration building designed by Conrad and Gargett, which offers a ready-made institutional identity.7 Crucially, the site is located directly adjacent to the State-owned 7.1-hectare former Visy Glass Factory site.8

The Government’s current plan for the Visy site, a mixed-use precinct of 4,000 homes following the cancellation of the International Broadcast Centre (IBC), risks fragmenting a contiguous 9-hectare riverfront holding.9 By acquiring the Lactalis site, the State consolidates this precinct, allowing for the integration of training facilities (Lactalis) with potential housing or parkland (Visy), thereby creating a holistic urban campus that serves both the economic and social needs of the city.

Recommendations

It is recommended that Cabinet:

  1. Authorise the Coordinator-General to immediately issue a Notice of Intention to Resume (NIR) for 108 Montague Road, South Brisbane, arresting the current settlement process with the private purchaser.
  2. Designate the Site for “Strategic State HBU” as an Educational and Industrial Technology precinct, overriding the residential focus of TLPI 02/2023.
  3. Establish the KCTC Taskforce, partnering with Constructionarium Australia, TAFE Queensland, and the Unite32 consortium to fast-track the retrofit of the facility for a 2027 operational launch.
2The Strategic Context: A Workforce in Crisis

The Quantitative Dimensions of the Labour Shortage

To understand the necessity of the Kurilpa Construction & Technology Campus, one must first confront the scale of the impending labour crisis. The “Business as Usual” approach to workforce planning has been rendered obsolete by the sheer velocity of Queensland’s infrastructure pipeline.

The Horizon 2032 Projections

The Horizon 2032 report, produced by Construction Skills Queensland (CSQ), serves as the primary evidentiary basis for this alarming outlook. The data indicate that the state’s construction industry is approaching a precipice. The pipeline of funded and committed work is forecast to grow from a baseline of $53 billion in the 2024-25 financial year to a peak of $77 billion in 2026-27.5 This represents a surge of unprecedented magnitude, driven not by a single sector, but by a “perfect storm” of competing demands:

  • Population Growth: With Queensland’s population projected to exceed 6 million by 2032, the demand for residential housing, schools, and hospitals creates a high baseline of construction activity that cannot be paused.5
  • Energy Transition: The aggressive push toward net-zero emissions requires a vast army of electrical and civil engineers to deliver renewable energy zones, transmission lines, and pumped hydro projects. These projects compete directly for the same trade base required for urban infrastructure.10
  • Olympic Compression: The delivery window for Olympic venues is immutable. The opening ceremony on July 23, 2032, acts as a hard deadline, compressing the construction schedule and removing the flexibility to delay projects to smooth labour demand.11

The result of this convergence is a projected labour deficit of terrifying proportions. CSQ estimates an average annual shortfall of 18,200 workers over the next eight years.3 However, averages conceal the severity of the peak. In the critical window of 2026-27, precisely when the KCTC is proposed to come online, the shortfall is expected to spike to 50,000 workers.3 Horizon 2032 places total sector demand at a peak of approximately 156,000 workers in 2026-27 against this shrinking supply base.5

The “Missing Middle” of Skills

The shortage is not uniform across all skill sets. While there is a general need for labourers, the acute crisis lies in the specialised trades required for complex vertical and civic infrastructure, the exact type of infrastructure required for the Games.

  • Structural Trades: Formworkers, steel fixers, and concreters are in critical undersupply. The shift to high-density living and large-span stadiums increases the intensity of concrete and steel usage per project, amplifying the need for these specific skills.10
  • Finishing Trades: As the housing target of one million homes by 2044 ramps up12, the demand for electricians, plumbers, and glaziers will outstrip supply.
  • Digital Engineering: The modernisation of the sector requires workers literate in Building Information Modelling (BIM) and digital twin technology. The current training infrastructure, largely based on 20th-century vocational models, is failing to produce these “hybrid” tradespeople at scale.13

The Economic Threat of Inaction

The economic consequences of failing to address this shortage extend far beyond project delays. The primary risk is hyper-inflation of capital costs.

When demand for labour exceeds supply by a margin of 50,000 workers, wage escalation becomes inevitable. The Queensland Major Contractors Association (QMCA) has already forecast construction costs to rise by over 7% in 2025, with sustained escalation through 2028.14

For the State Government, this inflation is a direct threat to fiscal stability. The $7.1 billion venue infrastructure envelope agreed upon by the State and Federal governments is fixed in nominal terms.3 If labour costs, which typically comprise 40-50% of civil construction project values, escalate by 20-30% due to scarcity, the real purchasing power of that $7.1 billion is eroded. This leads to two unacceptable outcomes:

  1. Scope Reduction: Iconic projects like the Brisbane Arena or the Sunshine Coast Indoor Sports Centre are value-engineered into mediocrity, failing to deliver the promised legacy.
  2. Budget Blowouts: The State is forced to inject supplementary funding, drawing resources away from health, education, and regional development, creating political vulnerability.

The Failure of the “Poaching” Strategy

Current government rhetoric, as articulated by Deputy Premier Jarrod Bleijie, suggests a strategy to “beg, borrow and steal workers” from interstate and overseas.3 This approach is fundamentally flawed for several reasons:

  • National Competition: New South Wales and Victoria are engaged in their own massive infrastructure builds (“Big Build” in Victoria, Metro West in Sydney). They are equally desperate for labour and are offering aggressive wage premiums to retain their workforce.16
  • Housing Constraints: Even if workers could be attracted to Queensland, the housing crisis in South East Queensland means there is nowhere for them to live. Vacancy rates are at historic lows, and rents are soaring.16 Importing 50,000 workers without a strategy to house them will only exacerbate the cost-of-living crisis for existing residents.
  • Sovereign Risk: Relying on transient labour creates a fragile workforce that can evaporate if economic conditions shift elsewhere. A sovereign capability approach, training Queenslanders, builds a permanent asset.

The Case for “Living Labs”

To solve a problem of this magnitude, the training model must change. Traditional classroom-based learning or remote TAFE campuses are too slow and too disconnected from the reality of major projects. The industry requires “Living Labs”, immersive training environments that simulate the pressure, complexity, and scale of real construction sites.17

The Constructionarium model, which allows students to build scaled replicas of real infrastructure (like the Story Bridge), has proven highly effective in accelerating competency.18 However, the current facilities at Salisbury are constrained by size and visibility. A flagship, inner-city campus at 108 Montague Road would supercharge this model, making construction visible, desirable, and accessible to a new demographic of school leavers who currently view the industry as “low tech.”

The “Legacy” Redefinition

The concept of “Olympic Legacy” has historically been defined by physical assets: stadiums, velodromes, and pools. However, the 2032 Games require a redefinition of legacy centred on Human Capital. The true legacy of the Games for Queensland should be a permanently upskilled workforce, capable of delivering the housing and infrastructure the state needs for decades after the closing ceremony.

The existing Construction Training Centre (CTC) at Salisbury, while valuable, is a legacy facility operating on a commercial leasing model.32 It lacks the visibility, scale, and integration with advanced technology required to attract a new generation of digital-native workers — underscoring the case for a flagship campus that can.

3Site Dossier: 108 Montague Road, South Brisbane

Property Particulars and Disposition

The subject site, known historically as the Pauls Ice Cream & Milk Factory, represents one of the most significant strategic landholdings on the Brisbane River peninsula.

Attribute Detail Reference
Address 108 Montague Road, South Brisbane QLD 4101 19
Land Area 1.697 Hectares (16,970 m²) 19
Lot Configuration 17 Amalgamated Lots 19
Zoning Kurilpa Sustainable Growth Precinct (TLPI 02/2023) 6
Current Status Under Contract (Vendor: Lactalis Australia) 2
Development Potential 189,000 m² GFA (Gross Floor Area) / ~2,300 Apartments 4
River Frontage Proximity to river; adjacent to riverfront parcels 1

The site is currently in a state of transition. Lactalis Australia announced the closure of the factory in early 2026, citing that the facility was “no longer fit for purpose” and that the suburb had transitioned away from industrial uses.4 The property was subsequently listed for sale by Savills and is now reportedly under contract.2 Intelligence suggests the purchaser is a major residential developer, consistent with recent acquisitions in the area such as Mosaic Property Group’s purchase of the nearby 91 Montague Road for $30 million.22 The site sits 1.3km from the Brisbane CBD and less than 1km from the South Brisbane and West End transport hubs, directly on the high-frequency Glider bus corridor.19

The Industrial Heritage of “Pauls”

The site is not a blank slate; it is a repository of Queensland’s industrial history. Pauls Ice Cream & Milk Ltd established its presence here in 1937, moving from smaller premises to compete with Peters Arctic Delicacy Co..7 The factory played a crucial role in the wartime economy, supplying dairy products to US and Australian forces in the Pacific theatre.

The most significant structure on the site is the Administration Building, located at the corner of Montague Road and Hope Street. Completed in 1944 and designed by the renowned Brisbane architectural firm Conrad and Gargett, this building is a Local Heritage Place (Citation 1518).7

  • Architectural Style: The building is a fine example of Inter-War Functionalist/Art Deco architecture. It features face brickwork, distinctive horizontal banding (expressing the “streamline” aesthetic of the era), and continuous cantilevered sun hoods.23
  • Landmark Value: The prominent corner entry tower stands as a visual anchor for the precinct. It was designed to complement the Montague Hotel opposite, creating a framed gateway to the industrial peninsula.

Under a private residential development model, the integrity of this building is at severe risk. Standard practice would likely involve “facadism”, retaining only the external skin of the heritage building to serve as a foyer for a 50-storey tower. This approach destroys the spatial and historical context of the structure. The KCTC proposal, by contrast, advocates for adaptive reuse, retaining the building as the functional administrative heart of the campus, preserving its interior volumes and its relationship to the street.

The “Visy Nexus” and Precinct Integration

The strategic value of 108 Montague Road cannot be assessed in isolation. It must be viewed in the context of the Visy Glass Factory site located immediately adjacent (or in close proximity) at 99-187 Montague Road.

  • The Visy Acquisition: In 2022, the State Government purchased the 7.1-hectare Visy site for $165 million.24 The stated intent was to construct the International Broadcast Centre (IBC) for the 2032 Olympics.
  • The Pivot: Following the 100-Day Review of Olympic Infrastructure in 2025, the IBC plan was scrapped due to cost concerns and flood risk.12 The Government has now pivoted to a “mixed-use” vision for the Visy site, inviting private developers to propose a precinct including 4,000 homes and public parkland.8

This pivot presents a risk and an opportunity. The risk is that the Visy site becomes just another residential enclave, failing to deliver a unique economic driver for the city. The opportunity lies in amalgamation. By acquiring the Lactalis site, the Government would control a massive, consolidated landholding of nearly 9 hectares in the inner city.

This scale is critical. A “Construction Campus” requires space for large machinery, laydown areas for materials, and outdoor simulation zones, activities that are difficult to accommodate on a constrained 1.7-hectare block but feasible within a 9-hectare integrated precinct. The Lactalis site can serve as the “hard” industrial training edge, buffering the residential/parkland uses proposed for the riverfront Visy lands.

Urban Planning and the TLPI Distortion

The planning context for the site is defined by the Kurilpa Temporary Local Planning Instrument (TLPI 02/2023).6 This instrument was introduced to facilitate rapid housing supply by suspending the existing City Plan height limits.

  • The Mechanism: The TLPI allows for “Higher density residential buildings” to reach heights limited only by aviation safety (approx. 274m or ~90 storeys).25
  • The Consequence: This zoning has artificially inflated the land value of 108 Montague Road. The “Under Contract” price likely reflects a yield of 2,000+ apartments.21

However, the TLPI creates a paradox. While intended to solve the housing crisis, it exacerbates the construction crisis. Every 90-storey tower approved under the TLPI draws hundreds of skilled workers away from the infrastructure projects needed to support that very population growth. The TLPI effectively prioritises private luxury development over public infrastructure capacity.

The acquisition strategy must therefore involve a planning override. By designating the site for “Community Infrastructure” or “Educational Establishments,” the State signals that the HBU is not a maximum residential yield, but a maximum strategic utility.

4The Proposal: Kurilpa Construction & Technology Campus (KCTC)

Concept and Vision

The Kurilpa Construction & Technology Campus (KCTC) is proposed as a sovereign capability asset designed to industrialise the production of skilled labour. It moves beyond the passive education model of a classroom and adopts the active, immersive model of a “Living Lab.”

The vision is to create a facility where the next generation of construction professionals, from apprentices to structural engineers, train on a site that mimics the complexity, safety standards, and technological environment of a Tier 1 major project. It brings the “site” to the “school.”

Functional Components and Curriculum

The KCTC will be divided into four primary operational zones, each targeting a specific deficit in the current workforce.

The “Constructionarium” Super-Hub

Building on the success of Constructionarium Australia18, the KCTC will host a permanent, large-scale simulation facility. Constructionarium currently operates at the Construction Training Centre in Salisbury, but its potential is limited by space and visibility.

  • The Model: Participants (undergraduates and apprentices) spend 8 days building a scaled replica of a major infrastructure asset (e.g., a 1:10 scale Story Bridge or a pumped hydro battery).26 This “build” covers the entire project lifecycle: tender, procurement, safety management, construction, and handover.
  • The Kurilpa Expansion: The Lactalis site allows for larger, more complex builds. We propose the installation of a “Variable Infrastructure Rig”, a flexible foundation system that can host rotating builds, such as a scaled section of the proposed Brisbane Arena roof or a segment of the Athlete Village modular housing.
  • Impact: This hands-on experience accelerates “site readiness.” Graduates emerge with a practical understanding of how engineering drawings translate to physical reality, reducing the “learning curve” costs for employers.
The Centre for Modern Methods of Construction (MMC)

To bridge the 50,000-worker gap, Queensland cannot rely solely on traditional manual labour. We must improve productivity through MMC (off-site manufacturing, pre-fabrication, and automation).

  • The Facility: A repurposed warehouse on the Lactalis site will house the MMC Centre. This will feature robotic bricklaying arms, 3D concrete printers, and CNC timber framing lines.
  • The Curriculum: Tradespeople will be upskilled in the operation and maintenance of these machines. This creates a new category of worker: the “Digital Tradesperson,” attractive to younger, tech-savvy recruits who might otherwise choose other industries.
  • Prototype Factory: The facility will serve as a prototyping ground for the modular units required for the Olympic Athlete Villages. This creates a direct feedback loop: trainees build the prototypes that will eventually be mass-produced for the Games.
The Heritage Design & Management Institute

The 1944 Pauls Administration Building7 will be adaptively reused to house the “brain” of the campus.

  • Adaptive Reuse Strategy: The cellular offices and boardrooms of the heritage building are ideal for conversion into design studios, BIM (Building Information Modelling) labs, and project management seminar rooms.
  • Digital Twin Command Centre: A central control room will be established where students can monitor the “live” builds in the Constructionarium zone using sensors, drones, and IoT (Internet of Things) technology.17 This teaches the digital skills required for managing modern smart infrastructure.
  • Soft Skills Academy: Dedicated spaces for training in safety leadership, mental health first aid, and procurement ethics, critical areas often neglected in technical training.
The Public Interface: “The Theatre of Construction”

A key failure of the construction industry is its invisibility; sites are hoarding-wrapped fortresses. The KCTC will be designed to be porous and visible.

  • Viewing Galleries: Safe, elevated walkways will allow the public and school groups to watch the training builds in progress. This “performative” aspect turns construction into a spectator sport, generating interest and recruitment leads.
  • The Pauls Plaza: The corner of Montague and Hope Streets will be activated with a public cafe and a small museum celebrating the site’s dairy history.27 This ensures the site remains a community asset, not a closed fortress, helping to mitigate local opposition to continued industrial use.

Operational Model: A Public-Private Partnership

The KCTC cannot be a purely bureaucratic entity. It requires the agility of the private sector and the stability of the state.

  • Governance: The campus will be managed by a new statutory body (or a subsidiary of the existing Construction Training Centre), with a board comprising representatives from TAFE Queensland, Major Contractors (e.g., CPB, Laing O’Rourke), and the Unions (CFMEU/ETU).
  • Funding: Operational costs will be shared. The State provides the facility (CapEx). Industry partners pay subscription fees or training levies (OpEx) in exchange for guaranteed access to graduates.
  • University Integration: The site’s proximity to UQ (via the Green Bridge), QUT, and Griffith University1 makes it an ideal satellite campus for their engineering and architecture faculties, fostering cross-pollination between trades and professions.
5The Economic Case: Strategic State HBU

Redefining Highest and Best Use (HBU)

In real estate valuation, HBU is typically the use that generates the maximum land value, in this case, high-density residential towers. However, for a government, HBU must be defined by Strategic Value.

  • Private HBU (Residential): Generates one-off stamp duty. Delivers ~2,000 apartments. Negative Externality: Consumes scarce labour, inflating construction costs for public works.
  • Strategic State HBU (KCTC): Generates 2,000+ skilled workers annually. Positive Externality: Deflates construction costs by increasing labour supply. Secures the delivery of the Olympics.

Cost of Inaction Analysis

The cost of acquiring the site must be weighed against the cost of not acting.

  • The Inflation Risk: The venue infrastructure budget is $7.1 billion. If the labour shortage causes a conservative 5% cost overrun due to wage inflation and delays, the cost to the State is $355 million.
  • The Acquisition Cost: The estimated market value of the site (based on the Mosaic sale of $30m for ~4,000m² nearby22) is high. At ~$7,000/m², the 1.7ha site could be valued at ~$118 million. With a premium to break the contract, the acquisition cost could reach $130-$140 million.
  • The ROI: Investing $140 million to prevent a $355 million blowout represents a Return on Investment of over 150%. This does not include the long-term economic benefit of a permanently upskilled workforce.

Opportunity Cost of Residential Development

Developing the site for residential use is not neutral; it is actively harmful to the State’s immediate goals. A 3-tower, 50-storey development requires:

  • ~300-500 workers on site for 3 years.
  • Massive quantities of concrete and steel.
  • Logistical capacity on Montague Road.

This project would directly compete for the same resources needed for the Brisbane Arena and the Gabba upgrade. By acquiring the site, the State effectively “de-risks” the resource pool, ensuring that labour and materials are directed toward priority public infrastructure rather than private luxury stock.

Mitigating the “White Elephant” Risk

The 100-Day Review scrapped the International Broadcast Centre at the Visy site because it was not “financially viable” and would become a white elephant.12 The KCTC avoids this fate for three reasons:

  • Demand is Perpetual: Even after 2032, Queensland’s growth (to 6 million people) ensures a permanent need for construction training.
  • Adaptability: The facility can pivot to train for whatever the next infrastructure wave requires (e.g., heavy rail, renewables, disaster resilience).
  • Real Estate Value: If, in 2040, the facility is no longer needed, the State still owns a prime riverfront asset that has appreciated significantly.
6Implementation Strategy and Governance

Legal Mechanism: Compulsory Acquisition

Given the site is “Under Contract,” time is of the essence. The State must utilise its powers under the State Development and Public Works Organisation Act 1971 or the Acquisition of Land Act 1967.

  • Notice of Intention to Resume (NIR): The Coordinator-General should immediately issue an NIR. This legal instrument freezes the private transaction. The contract cannot be settled once an NIR is in place.
  • Justification: The acquisition is for “Educational and Training Facilities,” a recognised public purpose. The strategic necessity of the Olympics provides the “compelling public interest” required to defend against legal challenges.
  • Compensation: The State will be required to pay “market value.” This will be a contentious negotiation given the TLPI zoning. However, the State can argue that the site’s value should be discounted by the significant infrastructure charges and flood mitigation costs associated with residential development, which the KCTC would not incur to the same degree.

Planning Override

To facilitate the KCTC, the State must override the residential focus of the Kurilpa TLPI.

  • Ministerial Infrastructure Designation (MID): The Minister for State Development can designate the site for “Education Facilities.” This removes the need for Brisbane City Council development approval and exempts the project from the residential provisions of the TLPI.
  • Master Plan Integration: The KCTC master plan should be developed in conjunction with the Visy site master plan. This ensures that the two precincts, one training/industrial, one mixed-use/parkland, interface correctly, perhaps sharing energy infrastructure or public realm elements.

Timeline and Phasing

Phase Action Timeline
1. Intervention Cabinet Approval; Issue Notice of Intention to Resume (NIR). Immediate (Month 1)
2. Acquisition Negotiation with Lactalis/Purchaser; Settlement. Months 2-6
3. Design & Scope Engage architects for adaptive reuse; define curriculum with CSQ/Constructionarium. Months 3-9
4. Early Works Site remediation; partial demolition of non-heritage structures. Months 10-14
5. Construction Fit-out of Heritage Building; Construction of MMC Hall. Months 15-24
6. Launch Campus operational; First cohort intake. Early 2028

Risk Management

Risk Mitigation Strategy
Valuation Dispute The developer “Under Contract” may claim compensation for lost profit. Mitigation: Rely on the strict interpretation of the Acquisition of Land Act, which compensates for the market value of the land, not speculative future profits from unapproved developments.
Community Backlash Residents may oppose “industrial” use in a residential area. Mitigation: Rebrand as “Clean Tech” and “Education.” Emphasise the heritage preservation and public plaza. It is a quieter neighbour than a 5-year high-rise construction site.
Flood Risk The site is near the river and prone to flooding. Mitigation: Use the ground plane for resilient uses (parking, heavy machinery training) that can be washed down. Elevate sensitive equipment (classrooms, digital labs) to the heritage building’s upper levels.
Operational Failure to attract sufficient students/trainees to the programme. Leverage the “Olympic” brand — “Train to Build the Games.” Offer scholarships and guaranteed employment pathways with partner contractors.
7Comparative Case Studies: Adaptive Reuse and Training

The “Constructionarium” Precedent (UK & Australia)

The Constructionarium model is not theoretical; it is a proven success.

  • UK: Established over a decade ago, it allows students to build scaled versions of the Gherkin, Ravenspurn Oil Rig, and Millau Viaduct.28
  • Victoria: The “Big Build” programme at Hallam utilises a bespoke “Big Build Bridge” to train graduates for the Level Crossing Removal Project.29
  • Queensland (Salisbury): The current facility builds a replica Story Bridge and Eleanor Schonell Bridge.26

Lesson for Kurilpa: The success of these programmes relies on partnership. The KCTC would scale this up, moving from a peripheral industrial estate (Salisbury) to a central urban showcase, drastically improving the industry’s brand.

University Academy (Adaptive Reuse of Aviation Terminal)

A relevant case study in adaptive reuse for education is the conversion of an abandoned airport terminal in Panama City, Florida, into the University Academy.

  • The Project: An obsolete transport facility was transformed into a charter school. The large open spans of the terminal were converted into flexible learning spaces, and the “industrial” aesthetic was retained to create a unique identity.30
  • Relevance: This demonstrates that industrial/transport buildings (like the Lactalis factory) are ideally suited for conversion into educational facilities. The large volumes, high ceilings, and robust structures allow for “messy” learning that standard classrooms cannot accommodate.

Why Not Elsewhere?

Two alternative sites were weighed against 108 Montague Road before settling on the Lactalis site as the recommendation of this brief.

Option A: Expand CTC Salisbury. Pros: existing facility, lower land cost. Cons: out of sight, out of mind; low prestige; poor public transport connectivity for students without cars; fails to rebrand the industry; distance from the CBD and major university partners.

Option B: Greenfields Site (Outer Suburbs). Pros: cheap land. Cons: disconnected from the “Olympic Precinct” (South Brisbane/CBD); unlikely to attract the high-calibre engineering talent and corporate partners who want a central hub.

Option C: 108 Montague Road (the proposal). Pros:

  • Proximity: Walking distance to South Bank, Cultural Centre, and the CBD.
  • Synergy: Adjacent to the State-owned Visy site (future mixed-use/parkland), allowing for a seamless campus environment.
  • Heritage: Authentic industrial atmosphere that “money can’t buy,” crucial for a compelling “Living Lab” environment.
  • Visibility: A billboard for the Government’s commitment to skills and jobs.
8Conclusion

The 2032 Brisbane Olympic and Paralympic Games present a choice for the Queensland Government. We can proceed with “Business as Usual,” allowing the market to cannibalise our limited workforce for luxury apartments, driving up the cost of the Games and risking a legacy of debt and unfinished projects. Or, we can intervene.

The acquisition of 108 Montague Road is a strategic imperative. It secures a critical land asset, preserves a piece of Brisbane’s history, and creates the engine room for the workforce of the future. The Kurilpa Construction & Technology Campus will be more than a training centre; it will be a statement of intent, a declaration that Queensland is serious about building its own capacity, securing its own future, and delivering a Games that leaves a legacy of human capital that will last for generations.

It is the recommendation of this Brief that the State move immediately to acquire the site.

9References

Sources referenced by the superscript numbers throughout this brief.

  1. 99-187 Montague Road, South Brisbane, QLD 4101 – Development Site & Land For Sale, accessed January 2026, https://www.realcommercial.com.au/for-sale/property-99-187-montague-road-south-brisbane-qld-4101-504998696
  2. South Brisbane Dairy Factory Closure Clears Way for Renewal – The Urban Developer, accessed January 2026, https://www.theurbandeveloper.com/articles/lactalis-australia-parmalat-site-closure-south-brisbane-redevelopment
  3. Worker shortage threatens Queensland’s 2032 Olympics plans – Perplexity, accessed January 2026, https://www.perplexity.ai/page/queensland-faces-worker-shorta-VALIX4UPRCmQoLrcaTinNg
  4. Lactalis to Close South Brisbane Dairy Facility Amid Urban Redevelopment – DairyNews, accessed January 2026, https://dairynews.today/global/news/lactalis-to-close-south-brisbane-dairy-facility-amid-urban-redevelopment.html
  5. HORIZON – Construction Skills Queensland, accessed January 2026, https://www.csq.org.au/wp-content/uploads/2025/04/CSQ-Horizon-2032_Full-Report.pdf
  6. Temporary Local Planning Instrument | Brisbane City Council, accessed January 2026, https://www.brisbane.qld.gov.au/building-and-planning/planning-and-design/temporary-local-planning-instrument
  7. Pauls Ice Cream & Milk Office – View PDF – Brisbane City Council, accessed January 2026, http://heritage.brisbane.qld.gov.au/sites/default/files/citation/pauls-ice-cream-milk-office_1518.pdf?t=1767679257
  8. Visy Site Transformation: 7.1ha Riverfront Land Opens For High-Rise Mixed-Use Proposals, accessed January 2026, https://brisbanedevelopment.com.au/visy-site-transformation-7-1ha-riverfront-land-opens-for-high-rise-mixed-use-proposals/
  9. Brisbane Olympic broadcast facility site swapped for mixed-use precinct plan, accessed January 2026, https://architectureau.com/articles/brisbane-olympic-broadcast-facility-site-swapped-for-mixed-use-precinct-plan/
  10. Queensland’s building workforce is ageing – QBCC, accessed January 2026, https://www.qbcc.qld.gov.au/news/queenslands-building-workforce-ageing
  11. 2032 Summer Olympics – Wikipedia, accessed January 2026, https://en.wikipedia.org/wiki/2032_Summer_Olympics
  12. South Brisbane riverfront to be transformed with city-shaping plan for industrial site – Media Statements, accessed January 2026, https://statements.qld.gov.au/statements/103722
  13. Infrastructure productivity and workforce roadmap, accessed January 2026, https://www.statedevelopment.qld.gov.au/__data/assets/pdf_file/0022/94009/infrastructure-productivity-and-workforce-roadmap-ipwr.pdf
  14. 2025 QMPP Findings – Queensland Major Contractors Association, accessed January 2026, https://qmca.com.au/2025-qmpp-findings/
  15. Tradie shortage threatens Brisbane 2032 Olympics | 7NEWS – YouTube, accessed January 2026, https://www.youtube.com/watch?v=HOVV-tzts0E
  16. Brisbane’s construction “dilemma” – JLL, accessed January 2026, https://www.jll.com/en-au/insights/brisbanes-construction-dilemma
  17. Transforming a Heritage Building into a Living Laboratory: A Case Study of Monitoring, accessed January 2026, https://www.mdpi.com/1996-1073/18/14/3622
  18. Constructionarium Australia, accessed January 2026, https://www.constructionariumaustralia.com.au/
  19. 108 Montague Road, South Brisbane, QLD 4101 – Development Site & Land For Sale, accessed January 2026, https://www.realcommercial.com.au/for-sale/property-108-montague-road-south-brisbane-qld-4101-504651220
  20. Dairy Giant Puts South Brisbane Site on Block – The Urban Developer, accessed January 2026, https://www.theurbandeveloper.com/articles/lactalis-south-brisbane-warehouse-for-sale
  21. Dairy Giant Puts South Brisbane Site On Block – EDairy News English, accessed January 2026, https://en.edairynews.com/dairy-giant-puts-south-brisbane-site-on-block/
  22. Riverfront site in South Brisbane sold to Mosaic for $30m – Knight Frank, accessed January 2026, https://www.theaseandeveloper.com/properties/2025/10/09/riverfront-site-south-brisbane-sold-mosaic-30m-knight-frank/1759977178
  23. Pauls Ice Cream & Milk Office – Brisbane Heritage Register, accessed January 2026, http://heritage.brisbane.qld.gov.au/heritage-places/1518
  24. Government Secures Site for International Broadcasting Centre – Brisbane Development, accessed January 2026, https://brisbanedevelopment.com.au/government-secures-site-for-international-broadcast-centre/
  25. Temporary Local Planning Instrument No. 1 of 2023 Kurilpa Sustainable Growth Precinct, accessed January 2026, https://dsdmip.engagementhq.com/87260/widgets/410406/documents/263132
  26. Queensland – Constructionarium Australia, accessed January 2026, https://www.constructionariumaustralia.com.au/queensland
  27. Pauls (dairy) Facts for Kids, accessed January 2026, https://kids.kiddle.co/Pauls_(dairy)
  28. About Constructionarium Australia., accessed January 2026, https://www.constructionariumaustralia.com.au/about
  29. Victorian Big Build Program – Constructionarium Australia, accessed January 2026, https://www.constructionariumaustralia.com.au/victoria
  30. University Academy: An Adaptive Reuse Case Study – DAG Architects, accessed January 2026, https://dagarchitects.com/news/university-academy-adaptive-reuse-case-study/
  31. Skills shortage threatens to stall Queensland’s construction future, accessed January 2026, https://www.mbqld.com.au/news-and-publications/media/skills-shortage-threatens-to-stall-queenslands-construction-future
  32. About Us – Construction Training Centre, accessed January 2026, https://ctc.qld.edu.au/about-us/
  33. Mosaic makes waves with $30m South Brisbane riverfront acquisition, accessed January 2026, https://a-d.com.au/buying-living/market-insights/mosaic-makes-waves-with-30m-south-brisbane-riverfront-acquisition
  34. Venues , The 2032 Delivery Plan | Queensland Government, accessed January 2026, https://www.delivering2032.com.au/legacy-for-queensland/venues