APN Codex Node 21840 21800 — State & Territory Conditions Certified

State Completion Lag

Readings
8 states
Period
Q2 2026
Range
−1.18σ to +1.76σ
Vintage
2026-Q4
1Node Definition

State Completion Lag (21840) measures, for each state and territory, whether the pipeline of dwellings under construction is taking longer to clear: the change over the year in months of pipeline, the stock of dwellings under construction divided by the past year’s completions and expressed in months. Higher readings mean completion lags lengthening. It publishes eight readings, each against the jurisdiction’s own history, and belongs to State & Territory Conditions (21800). The national level reading is Construction Completion Lag (21290).

Known limitations

The input is the change over the year in months of pipeline, not its level: the level rises over the decades as building shifts towards apartments, which take longer to complete, so the level is shown as context only. Both inputs are ABS original series; four quarters of completions remove the dip in completions each March quarter, so no seasonal baseline is needed. The Northern Territory and the ACT are small and volatile (baseline standard deviations of 4.45 and 5.28 months, against 1.44 to 3.74 elsewhere). ABS revises building activity as later returns arrive, and the June quarter 2026 edition revised the March quarter; the stored history carries the revision.

2Metric Definition

Primary metric: Node Z-Score by state (Z21840,s)

Z-Score Construction, for each state s
Range (Q2 2026)−1.1775σ to +1.7579σ
Us,tDwellings under construction in state s at the end of quarter t
Cs,tDwellings completed in state s in quarter t
Ms,tMonths of pipeline: the months it would take to complete the stock under construction at the past year’s rate of completion
μs, σsThe state’s own baseline mean and sample standard deviation of ΔM, 2011–2025 (60 quarters)

Position. Each reading is ranked against the state’s own 161 quarters from June 1986, the first quarter with a year-earlier level to compare; every position is empirical.

3Data Sources
InputSourceFrequencyCoverage
Dwellings under construction, by stateABS Building Activity, Australia (8752.0), Table 77, originalQuarterlySeptember quarter 1984 to June quarter 2026
Dwellings completed, by stateABS Building Activity, Australia (8752.0), Table 38, originalQuarterlySeptember quarter 1984 to June quarter 2026
Dwellings commenced, by state (context)ABS Building Activity, Australia (8752.0), Table 34, originalQuarterlySeptember quarter 1984 to June quarter 2026

Tier-1 sovereign statistical releases. No commercial data provider dependency exists within this node.

4The Eight Readings

Year to June 2026, ordered by reading. Months of pipeline is the level at each June; the change is the input. Each z is against the state’s own 2011–2025 average; each position ranks the state against its own 161 quarters. The last column is completions divided by commencements over the past four quarters: below 1.00, work is starting faster than it is finishing.

StateMonths of pipeline, June 2025June 2026Change (months)Q2 2026 ZPosition (of 161)Q1 2026 ZCompletions ÷ commencements
Queensland14.6618.22+3.55+1.7579σ97.5+2.1575σ0.75
Western Australia12.3517.81+5.46+1.4014σ96.2+0.8702σ0.77
Australian Capital Territory14.9519.77+4.82+0.8511σ86.9+0.3930σ0.77
Tasmania10.5711.83+1.26+0.7224σ80.6+1.0148σ0.93
South Australia13.2013.96+0.76+0.2062σ67.5−1.0575σ0.89
Victoria13.2013.52+0.32+0.1205σ56.2+0.8592σ0.98
Northern Territory14.1411.72−2.42−0.6342σ16.2−0.4319σ0.88
New South Wales21.3119.03−2.28−1.1775σ7.5+0.7281σ0.96
Lags lengthening
6 of 8
change over the year above zero
Highest reading
+1.7579σ
Queensland
Lowest reading
−1.1775σ
New South Wales
Largest lengthening
+5.46 months
Western Australia
National level (21290)
+2.0205σ
90.4 of 84
Quarters ranked
161
per state
5Reading History

One chart per state on the same scale (−3σ to +3σ), from March 2011. Each line is the state’s z against its own 2011–2025 average; the shaded band is the middle 80% of all its ranked quarters from June 1986.

New South Wales
−1.1775σ · June 2026 · position 7.5 of 161
Victoria
+0.1205σ · June 2026 · position 56.2 of 161
Queensland
+1.7579σ · June 2026 · position 97.5 of 161
South Australia
+0.2062σ · June 2026 · position 67.5 of 161
Western Australia
+1.4014σ · June 2026 · position 96.2 of 161
Tasmania
+0.7224σ · June 2026 · position 80.6 of 161
Northern Territory
−0.6342σ · June 2026 · position 16.2 of 161
Australian Capital Territory
+0.8511σ · June 2026 · position 86.9 of 161
ReadingNormal range (middle 80% of the state’s 161 ranked quarters)June quarter 2026
6Analytical Interpretation

Over the year to June 2026, completion lags lengthened in six of the eight jurisdictions, most in Queensland (14.66 to 18.22 months of pipeline, +1.7579σ, position 97.5) and Western Australia (12.35 to 17.81 months, +1.4014σ, the highest since June 2022). The ACT’s reading (+0.8511σ) is its highest since June 2024. In Queensland, Western Australia and the ACT, completions over the past year ran at about three-quarters of commencements (0.75 to 0.77): work is starting faster than it is finishing, so the stock under construction is growing relative to the rate at which it clears.

Lags shortened in New South Wales and the Northern Territory. New South Wales reads −1.1775σ, position 7.5, its lowest since September 2019: its pipeline fell from 21.31 to 19.03 months as completions ran close to commencements (0.96). It is shortening from a high level — 19.03 months is still the second-longest of the eight, after the ACT’s 19.77. The Northern Territory (−0.6342σ) is at its lowest since March 2024.

Queensland’s reading is below its March quarter reading of +2.1575σ: its lag is still lengthening over the year, but by less than it was. South Australia moved from −1.0575σ in March to +0.2062σ, and Western Australia from +0.8702σ to +1.4014σ.

8Certification Statement
APN Codex Node 21840 — State Completion Lag — Certified
  • All inputs are sourced from Tier-1 sovereign statistical releases (ABS)
  • Each of the eight Z-scores (Q2 2026) is derived directly from that state’s inputs against its own 2011–2025 baseline, not manually entered or estimated
  • Each position is an empirical percentile rank against the state’s 161 quarters from June 1986
  • The use of the change rather than the level, the volatility of the two territories and the March quarter revision are disclosed
  • No commercial data provider dependency exists within this node