Engineering construction work done for the public sector on roads, water, sewerage and electricity totalled $10.7 billion in the March quarter of 2026. Over the year to that quarter the total reached $46.7 billion, the highest in current prices in a series that starts in 1986 and 136% above the same measure five years earlier. Growth has slowed sharply: March quarter work was 1.2% higher than a year earlier, the slowest since early 2021. This includes the work that turns land into serviced lots, and it is measured in dollars spent, not lots delivered.
Figures are the ABS value of engineering construction work done for the public sector, in current prices. They are not adjusted for construction cost inflation, and they cover all work of these types, not only the work that serves new housing.
Why this spending sits behind housing supply
A dwelling cannot be occupied until the land it sits on is connected: a road to reach it, water and sewerage to service it, and an electricity connection. Much of that work is commissioned by governments and their utilities, which is why engineering construction done for the public sector is a useful guide to whether the groundwork for new housing is being laid. Work commissioned by private developers and privately owned utilities is not included.
The ABS publishes the value of engineering construction work done for the public sector each quarter, split by type of construction. Four of those types carry the work housing depends on: roads, highways and subdivisions; water storage and supply; sewerage and drainage; and electricity. The figures below add those four together. They are in current prices, so they rise with construction costs as well as with the amount of work, and they count all work of each type, including projects with no connection to new housing.
A larger programme than five years ago
In the year to the March quarter of 2026, $46.7 billion of this work was done for the public sector, against $19.8 billion in the year to March 2021 — a rise of 136%. For scale, the producer price index for inputs to house construction rose 34.9% over the same five years. That index covers house building rather than engineering work, so it is only a rough guide to how much of the rise reflects higher costs.
The programme is also larger than at any earlier point in the series, in current prices. Before the current upswing, its high was $25.9 billion in the year to March 2013, after which it fell for three years, to $18.0 billion in the year to March 2016. The annual total rose a further 5.0% over the year to March 2026, setting a new high in each of the last four quarters.
Public engineering work done by type, years to March, $ billion, 2012–2026
Source: ABS Engineering Construction Activity, Australia, public sector work done by type of construction, original, current prices. Each bar sums the four quarters to the March quarter of the year shown. The dark marker shows the four-type total.
Electricity and water grew fastest
The composition has shifted. Roads remain the largest single type, at 48.2% of the annual total, but the fastest growth over five years was in electricity, up 228% from $3.2 billion to $10.6 billion a year. Water rose 173% and sewerage 161%, while roads rose 96%. Electricity now accounts for 23% of the annual total.
Water and sewerage together, the two types most closely tied to servicing land for housing, rose 167% over the five years, from $5.1 billion to $13.6 billion a year.
Change in public work done by type, year to March 2021 compared with year to March 2026, %
Source: ABS Engineering Construction Activity, Australia, public sector work done by type, current prices. Each bar compares the four quarters to March 2026 with the four quarters to March 2021; the note gives the two annual totals.
The build-up has slowed sharply
Quarterly growth tells a different story from the five-year total. In the March quarter of 2022 this work was 41% higher than a year earlier, and it stayed above 20% in most quarters through to the end of 2024. Since then it has slowed in all but one quarter: 16.0% in the March quarter of 2025, 7.8% in June, 8.3% in September, 2.6% in December and 1.2% in the March quarter of 2026. That is the slowest since the March quarter of 2021, which was the last quarter in which this work fell.
Over the full series the average annual change is 7.3%, and the latest reading sits below about two-thirds of the quarters since 1987. The series has had long downturns before: work fell for twelve consecutive quarters from the June quarter of 2013, reaching 23% below its year-earlier level in the September quarter of 2014.
Annual change in public work done on roads, water, sewerage and electricity, %, 1987–2026
Source: ABS Engineering Construction Activity, Australia, public sector work done by type, current prices; four types combined, each quarter compared with the same quarter a year earlier. The dotted line is the average across the whole series.
What the figures do and do not show
These are dollars of work done, not connections delivered or lots serviced, and the ABS does not publish a split showing which projects serve new housing. A large transmission project and a utility’s trunk water main both count. The figures are national; the ABS also publishes them by state, which is not covered here. And because they are in current prices, part of any rise reflects the cost of doing the work rather than more of it being done.
What they do show is the scale and direction of the public groundwork. It is far larger than five years ago, weighted more towards electricity than it was, and its growth has slowed sharply. How housing has fared against other claims on the construction industry’s capacity is examined in APN’s review of the contest for construction capacity, which measures all engineering construction in real terms, so its growth figures are not comparable with those here.
Findings are presented on the basis of data and evidence alone.