Materials, Workers and the Pipeline: Is the Building Supply Chain Under Strain in 2026?

Materials, Workers and the Pipeline: Is the Building Supply Chain Under Strain in 2026?

Building a home needs materials, workers and a pipeline of work the industry can get through. In the June quarter 2026 two of those three pressures were lower than usual. Construction job vacancies were 1.48% of filled jobs, against a 2011–2025 average of 1.62%, and new dwelling approvals were lower than usual relative to the work being done. The third is rising: the cost of materials and other inputs to house building rose 3.8% over the year to June, up from 1.8% at the end of 2025 and the fastest since September 2023.

Data anchors · APN Supply Chain Strain Index™ (24430) at −0.2303σ, June quarter 2026, position 42.4, ranked against 60 quarters, the highest since December 2023 · house-building input costs up 3.8% over the year, the fastest since September 2023 · construction job vacancies at 1.48% of filled jobs, below the 2011–2025 average of 1.62%.
The index combines three measures of strain on home building: input costs, unfilled construction jobs, and approvals arriving against the work the industry is getting through. Higher means more strain.

Three pressures on building

A builder’s capacity to deliver new homes depends on three things moving together: what materials and other inputs cost, whether there are enough workers to hire, and how much new work is arriving against the work already in hand. This article reads each from ABS data, and then the APN index that combines them.

  • Input costs: the ABS producer price index for inputs to house construction, which prices materials such as timber, concrete, steel, plumbing and electrical fittings across the six capital cities. It does not price labour.
  • Job vacancies: construction job vacancies as a share of construction filled jobs, from the ABS Job Vacancies survey and the ABS Labour Account.
  • Approvals against work done: dwelling units approved in a quarter for every $1 million of residential building work done in the same quarter, with work done measured in chain volume terms, which removes price changes. A rising ratio means approvals are growing faster than residential work done.

Input costs are rising again

Input costs for house construction, growth over the year, September quarter 2011 to June quarter 2026
0%3%6%9%12%15%18%201220132014201520162017201820192020202120222023202420252026Input costs, growth over the yearAverage, 2011 to 20253.8%

APN calculation based on Australian Bureau of Statistics data: Producer Price Indexes, Australia, September quarter 2011 to June quarter 2026, Table 18, input to the house construction industry, six capital cities (A2390558X). Growth over the year in the original index. Dotted line: the March quarter 2011 to December quarter 2025 average.

Input-cost growth ran between 0.6% and 3.6% a year from 2011 to early 2021, then rose to 17.3% in the June quarter 2022. It fell back to 1.1% by mid-2024. Over 2025 it stayed low: the National Housing Supply and Affordability Council, in its State of the Housing System 2026, found house construction material costs rose 1.8% over 2025, slightly below their pre-pandemic ten-year average of 2.1% (NHSAC, April 2026).

In 2026 growth picked up: 2.5% over the year to March and 3.8% to June, the fastest since September 2023 and slightly above the 2011–2025 average of 3.5%. The Council’s housing supply estimates were stated as applying “before recent global disruptions to commodity prices and supply chains”, and it noted that construction materials that rely on petrochemicals may become harder to access. The ABS attributed the June quarter rise largely to higher raw material, freight and fuel costs and to supply chain disruptions associated with the conflict in the Middle East; APN does not attribute it further. A companion article sets out which materials are driving building costs in 2026.

Fewer unfilled construction jobs

Construction job vacancies as a share of construction filled jobs, September quarter 2011 to June quarter 2026
0.0%0.5%1.0%1.5%2.0%2.5%3.0%3.5%201220132014201520162017201820192020202120222023202420252026Construction vacancy rateAverage, 2011 to 20251.48%

APN calculation based on Australian Bureau of Statistics data: Job Vacancies, Australia, construction job vacancies (A3571817T, original), as a percentage of construction filled jobs (Labour Account Australia, modelled state estimates by industry, original), September quarter 2011 to June quarter 2026. Vacancies are surveyed in the middle month of each quarter. Dotted line: the 2011–2025 average.

Construction job vacancies were 1.48% of filled jobs in the June quarter 2026 (the survey month is May), against 1.616% in March, just under the 2011–2025 average of 1.621%. The rate peaked at 3.27% in the June quarter 2022, when it was more than double its 2016 level, and has been below its average in every quarter since September 2025. The ABS August 2026 survey, released on 1 October, put construction vacancies at 20.0 thousand, little changed from 19.9 thousand in May (original) (ABS, Job Vacancies, Australia).

A lower vacancy rate is not an absence of shortage. The Council described “chronic labour shortages in the construction sector” as continuing bottlenecks to new housing, and reported that labour shortages continued to place upward pressure on costs, particularly for higher-density projects. Jobs and Skills Australia’s 2025 Occupation Shortage List found 29% of occupations in shortage, down from 33% in 2024, with “nearly half of trade roles” still in shortage, construction among them (Jobs and Skills Australia, October 2025). The vacancy rate measures how many jobs employers are advertising against those filled, not how hard they are to fill.

Approvals are catching up with the work

Dwelling units approved per $1 million of residential building work done, September quarter 2011 to June quarter 2026
1.501.752.002.252.502.75201220132014201520162017201820192020202120222023202420252026Dwellings approved per $1m of residential work doneAverage, 2011 to 20251.90

APN calculation based on Australian Bureau of Statistics data: Building Approvals, Australia, dwelling units approved (A422070J, seasonally adjusted), per $1 million of residential building work done (Construction Work Done, Australia, Preliminary, A83778139T, chain volume, seasonally adjusted), September quarter 2011 to June quarter 2026. Dotted line: the March quarter 2011 to December quarter 2025 average.

In the June quarter 2026, 1.90 dwellings were approved for every $1 million of residential building work done, against a 2011–2025 average of 2.06. The ratio was highest in the apartment building cycle of 2013 to 2015 (2.65 in December 2013) and lowest in March 2023 (1.63). It has been below its average in every quarter since December 2022, so approvals have been lower than usual relative to the work being done. June’s 1.90 is the highest since December 2022. A companion article sets out how long the dwellings now under construction would take to complete.

What the APN index reads

APN Supply Chain Strain Index™, September quarter 2011 to June quarter 2026
−1.5−1.0−0.50.00.51.01.52.02.5201220132014201520162017201820192020202120222023202420252026APN Supply Chain Strain Index−0.23

APN Supply Chain Strain Index™ (24430). APN calculation based on Australian Bureau of Statistics data. Weighted sum of the three inputs’ standardised readings (standard deviations from each input’s 2011–2025 average), September quarter 2011 to June quarter 2026. Higher means more strain.

APN Supply Chain Strain Index™ (24430) combines the three measures, each standardised against its 2011–2025 history: input costs at a weight of 0.4 and the other two at 0.3 each. It reads −0.2303σ, June quarter 2026, position 42.4, ranked against 60 quarters. A reading below zero means the three pressures together are below their 2011–2025 average. The index has risen in each of the last two quarters, from −0.51 in December 2025 to −0.33 in March and −0.23 in June, its highest since December 2023. Its highest reading was 2.29 in the June quarter 2022, one of four quarters in 2021 and 2022 in which all three measures sat above their averages at once; its lowest was −0.90 in the June quarter 2020.

Contribution of each measure to the June quarter 2026 reading
−0.3−0.2−0.10.00.1Input costs (weight 0.4)0.027Job vacancies (weight 0.3)−0.075Approvals against work done (weight 0.3)−0.182

APN Supply Chain Strain Index™ (24430). APN calculation based on Australian Bureau of Statistics data. Each input’s standardised reading times its weight, June quarter 2026. The three bars sum to the index reading.

Contribution of each measure to the change from the March quarter 2026
−0.10−0.050.000.050.100.15Input costs (weight 0.4)0.129Approvals against work done (weight 0.3)0.046Job vacancies (weight 0.3)−0.072

APN Supply Chain Strain Index™ (24430). APN calculation based on Australian Bureau of Statistics data. Change in each weighted input from the March quarter to the June quarter 2026. The three bars sum to the change in the index.

Input costs, just above their average, add 0.027; approvals against work done subtract 0.182, and job vacancies 0.075. Of the rise of 0.104 from March, input costs contributed 0.129 and approvals 0.046, while the fall in vacancies took off 0.072. The index is one of the components of the APN Future Development Pipeline Index™; a companion article sets out five conditions for building new homes in the June quarter 2026.

3.8%
Growth in house-building input costs, year to June quarter 2026
1.48%
Construction job vacancies as a share of filled jobs, June quarter 2026
1.90
Dwellings approved per $1m of residential work done, June quarter 2026
−0.23σ
APN Supply Chain Strain Index™, June quarter 2026

What this does not show

The input-cost index prices materials and other inputs to house building only: it does not cover labour, and it does not cover apartment building. The vacancy rate divides a survey count of vacancies by modelled estimates of filled jobs, both in original terms (not seasonally adjusted), and the vacancy survey carries sampling error, so small quarterly moves are not meaningful; construction’s rate also moves closely with the economy-wide vacancy rate. Approvals against work done compares two flows: it is not a count of the dwellings in the pipeline, and because work done is measured in dollars, it moves with the size and mix of dwellings as well as with the industry’s capacity. Not one of the three measures says how long builds take or what they cost to finish, and the index does not forecast costs or completions.

Methodology note. APN Supply Chain Strain Index™ (24430) reads −0.2303σ, June quarter 2026, position 42.4, ranked against 60 quarters. It is the weighted sum of three standardised measures: growth over the year in the ABS producer price index for inputs to house construction (Table 18, six capital cities, original; weight 0.4); construction job vacancies (ABS Job Vacancies, original) as a percentage of construction filled jobs (ABS Labour Account modelled state estimates, original; weight 0.3); and dwelling units approved (ABS Building Approvals, seasonally adjusted) per $1 million of residential building work done (ABS Construction Work Done, chain volume, seasonally adjusted; weight 0.3). Each measure is standardised against its 2011–2025 mean and standard deviation; the vacancy measure begins in September 2011. Higher readings mean more strain. Positions rank a quarter against the 60 quarters from September 2011, 0 the lowest.
Sources

ABS material is used under a Creative Commons Attribution 4.0 International licence. Calculations, standardisations and index readings are APN’s and are not attributable to the ABS.

NHSAC and Jobs and Skills Australia material is quoted from the published report and release.

Disclaimer

The analysis and information contained in this publication are for general informational and strategic purposes only and do not constitute financial, investment, legal, or any other form of professional advice. Australian Property Network is not a licensed financial advisor. Property values and market conditions can go up or down. Before making any property or investment decisions, you must conduct your own thorough research and seek independent professional advice tailored to your specific circumstances. Images are for illustrative purposes only. E.&O.E.

Findings are presented on the basis of data and evidence alone.

APN National
APN National

APN National is Australian Property Network's principal analysis desk, publishing APN's core research and market commentary across the economic, policy and structural forces shaping the Australian property market.

Related Posts
Leave a Reply