1What It Measures

Pipeline Congestion measures how much committed construction work is waiting to be done, and how far permissions are running ahead of building starts. It is the branch’s measure of accumulation rather than activity.

The node is a component of Supply Pipeline Conditions (24740), which in turn sits within the APN Investment Conditions Index™ (24700). It is a national time series, not a geographic one — there is no locality distribution or map at this node.

Where Approvals Flow (24741) and Commencements (24742) measure what enters the pipeline, and Work In Progress (24743) measures what sits inside it, this node measures the pressure building within it: value contracted but not yet built, and the widening gap between approval and start.

2Composite Construction
ComponentSourceWeight
Value of work yet to be doneABS50.0%
Approvals-to-commencements spreadABS, derived50.0%

The first measures the dollar value of contracted building work not yet carried out; the second measures the quarterly gap between dwellings approved and dwellings started.

3Current Reading in Context
MeasureQuarter to Jun 2026Standardised
Value of work yet to be done$165,839.5m+3.34
Approvals-to-commencements spread1,786+0.33
Composite—+1.84

The standardised column expresses each input against its own 2011–2025 comparison window. The value of work yet to be done sits at the top of its own recorded range and is the dominant contributor to the composite.

4Reading History
Pipeline Congestion (24744) · Reading History
Node Z-Score by Quarter, March 2011 to June 2026
+1.8356σ · position 100.0, ranked against 62 quarters
Reading, ranked quartersNormal range (middle 80% of ranked quarters)Current reading

The June quarter 2026 reading, +1.8356σ, is the highest of the 62 ranked quarters (position 100.0) and sits above the normal range of −0.8010σ to +1.0073σ. Quarters before March 2011 lack full input coverage and are not ranked; they are listed in the data table.

Show the data
QuarterReadingBasis
Q3 1983+0.4803σPartial coverage
Q4 1983+0.3455σPartial coverage
Q1 1984+0.4821σPartial coverage
Q2 1984+0.3857σPartial coverage
Q3 1984+0.0677σPartial coverage
Q4 1984+0.0788σPartial coverage
Q1 1985+0.3994σPartial coverage
Q2 1985+0.2255σPartial coverage
Q3 1985+0.1190σPartial coverage
Q4 1985+0.2182σPartial coverage
Q1 1986−0.2987σPartial coverage
Q2 1986+0.2635σPartial coverage
Q3 1986+0.0097σPartial coverage
Q4 1986−0.0429σPartial coverage
Q1 1987−0.0754σPartial coverage
Q2 1987+0.3566σPartial coverage
Q3 1987+0.2578σPartial coverage
Q4 1987+0.3836σPartial coverage
Q1 1988+0.5786σPartial coverage
Q2 1988+0.8226σPartial coverage
Q3 1988+0.6559σPartial coverage
Q4 1988−0.0792σPartial coverage
Q1 1989+0.2205σPartial coverage
Q2 1989+0.5664σPartial coverage
Q3 1989−0.2483σPartial coverage
Q4 1989−0.1445σPartial coverage
Q1 1990+0.2434σPartial coverage
Q2 1990+0.0484σPartial coverage
Q3 1990+0.0184σPartial coverage
Q4 1990−0.1726σPartial coverage
Q1 1991+0.1190σPartial coverage
Q2 1991+0.3176σPartial coverage
Q3 1991+0.4289σPartial coverage
Q4 1991−0.0166σPartial coverage
Q1 1992+0.3648σPartial coverage
Q2 1992+0.3619σPartial coverage
Q3 1992+0.1561σPartial coverage
Q4 1992+0.2111σPartial coverage
Q1 1993+0.4436σPartial coverage
Q2 1993+0.1783σPartial coverage
Q3 1993+0.0669σPartial coverage
Q4 1993−0.0743σPartial coverage
Q1 1994+0.2878σPartial coverage
Q2 1994+0.3590σPartial coverage
Q3 1994+0.3334σPartial coverage
Q4 1994−0.5783σPartial coverage
Q1 1995+0.0538σPartial coverage
Q2 1995−0.1445σPartial coverage
Q3 1995−0.1278σPartial coverage
Q4 1995−0.1856σPartial coverage
Q1 1996−0.1643σPartial coverage
Q2 1996−0.0174σPartial coverage
Q3 1996+0.4282σPartial coverage
Q4 1996+0.0684σPartial coverage
Q1 1997−0.0276σPartial coverage
Q2 1997+0.4021σPartial coverage
Q3 1997+0.5074σPartial coverage
Q4 1997−0.1787σPartial coverage
Q1 1998+0.0971σPartial coverage
Q2 1998+0.4954σPartial coverage
Q3 1998−0.0542σPartial coverage
Q4 1998+0.1539σPartial coverage
Q1 1999+0.2755σPartial coverage
Q2 1999+0.3595σPartial coverage
Q3 1999+0.4102σPartial coverage
Q4 1999+0.5156σPartial coverage
Q1 2000+0.2458σPartial coverage
Q2 2000−0.8467σPartial coverage
Q3 2000−0.2893σPartial coverage
Q4 2000+0.0815σPartial coverage
Q1 2001+0.0903σPartial coverage
Q2 2001+0.7255σPartial coverage
Q3 2001+0.4367σPartial coverage
Q4 2001+0.1349σPartial coverage
Q1 2002−0.0075σPartial coverage
Q2 2002+0.2189σPartial coverage
Q3 2002−0.2113σPartial coverage
Q4 2002+0.2119σPartial coverage
Q1 2003+0.0981σPartial coverage
Q2 2003+0.5409σPartial coverage
Q3 2003+0.6277σPartial coverage
Q4 2003−0.0889σPartial coverage
Q1 2004+0.1957σPartial coverage
Q2 2004+0.2784σPartial coverage
Q3 2004−0.0732σPartial coverage
Q4 2004−0.3878σPartial coverage
Q1 2005+0.1522σPartial coverage
Q2 2005+0.3943σPartial coverage
Q3 2005−0.4296σPartial coverage
Q4 2005−0.0816σPartial coverage
Q1 2006−0.0145σPartial coverage
Q2 2006+0.0898σPartial coverage
Q3 2006+0.1253σPartial coverage
Q4 2006−0.5644σPartial coverage
Q1 2007+0.0898σPartial coverage
Q2 2007+0.1641σPartial coverage
Q3 2007+0.0446σPartial coverage
Q4 2007+0.1709σPartial coverage
Q1 2008−0.0871σPartial coverage
Q2 2008+0.0733σPartial coverage
Q3 2008−0.0965σPartial coverage
Q4 2008−0.2024σPartial coverage
Q1 2009−0.2206σPartial coverage
Q2 2009+0.4751σPartial coverage
Q3 2009+0.6113σPartial coverage
Q4 2009−0.0596σPartial coverage
Q1 2010+0.2515σPartial coverage
Q2 2010−0.2652σPartial coverage
Q3 2010+0.1735σPartial coverage
Q4 2010+0.5667σPartial coverage
Q1 2011−0.8906σRanked
Q2 2011−0.6275σRanked
Q3 2011−0.3361σRanked
Q4 2011−1.1715σRanked
Q1 2012−0.3845σRanked
Q2 2012−0.1606σRanked
Q3 2012−0.7650σRanked
Q4 2012−0.8030σRanked
Q1 2013−0.7830σRanked
Q2 2013−0.4161σRanked
Q3 2013+0.3447σRanked
Q4 2013+0.1800σRanked
Q1 2014−0.3448σRanked
Q2 2014−0.1452σRanked
Q3 2014−1.0108σRanked
Q4 2014+0.3041σRanked
Q1 2015+0.2710σRanked
Q2 2015+0.2080σRanked
Q3 2015−0.3388σRanked
Q4 2015−0.2169σRanked
Q1 2016−0.9717σRanked
Q2 2016+0.3334σRanked
Q3 2016+0.4513σRanked
Q4 2016−1.3469σRanked
Q1 2017−0.1687σRanked
Q2 2017−0.1478σRanked
Q3 2017+0.0089σRanked
Q4 2017+0.4994σRanked
Q1 2018−0.6673σRanked
Q2 2018−0.1075σRanked
Q3 2018−1.1282σRanked
Q4 2018−0.5761σRanked
Q1 2019−0.0362σRanked
Q2 2019−0.4166σRanked
Q3 2019−0.1753σRanked
Q4 2019+0.0616σRanked
Q1 2020−0.2187σRanked
Q2 2020−0.1957σRanked
Q3 2020+0.1826σRanked
Q4 2020+0.0661σRanked
Q1 2021+1.2104σRanked
Q2 2021−0.6054σRanked
Q3 2021−0.0962σRanked
Q4 2021−0.1586σRanked
Q1 2022+0.2705σRanked
Q2 2022+0.5648σRanked
Q3 2022+0.7727σRanked
Q4 2022+1.3066σRanked
Q1 2023−0.4109σRanked
Q2 2023+0.4461σRanked
Q3 2023+0.6638σRanked
Q4 2023+0.8943σRanked
Q1 2024+0.3358σRanked
Q2 2024+0.5858σRanked
Q3 2024+0.6187σRanked
Q4 2024+1.4684σRanked
Q1 2025+0.8103σRanked
Q2 2025+1.2511σRanked
Q3 2025+1.0198σRanked
Q4 2025+0.6920σRanked
Q1 2026+1.7699σRanked
Q2 2026+1.8356σRanked
5Reading the Pattern

The composite sits at the highest reading in this node's recorded history. The value of contracted work not yet carried out is at the top of its range, and approvals continue to run ahead of starts.

Of the two inputs, the work-yet-to-be-done measure carries most of the reading, at +3.34 against the approvals-to-commencements spread at +0.33. The congestion recorded here is therefore principally a matter of contracted value awaiting execution rather than of a dramatic widening at the approval stage.

Read across the branch, the four components describe a consistent position: permissions and starts both above average, part-built stock at a record, and committed-but-unbuilt value at the top of its range. That is a pipeline carrying an unusually large volume of work it has not yet delivered.

The index reads that congestion as an adverse condition. A congested pipeline can describe substantial demand for construction or constrained capacity to deliver it. The ruled direction for this component treats it as the latter: work committed but not delivered is supply the market has been promised and has not received, so the component enters the index negated. Its intensity position of 100.0 and its signed position of 0.0 are the same quarter seen from the two ends of that direction.

6Methodology & Disclosed Caveats
  • The work-yet-to-be-done input covers total building, not residential alone. It combines residential and non-residential building work. This is the deliberate and ratified scope for an investment-conditions node, where non-residential construction competes for the same labour, materials and finance. It differs from the residential-only measures used in the 21500 series, and figures from the two are not interchangeable.
  • The reading of 100.0 is at the ceiling of its scale. This node's position is expressed as a rank against the 62 quarters in which both inputs are present, and the June 2026 quarter is the highest reading in that history. The top observation in any such ranking receives 100.0 by construction; the figure does not measure by how far it exceeds the next. The underlying reading of +1.84 standard deviations carries that magnitude into the index, which the capped position alone does not.
  • The two inputs are measured in different units — dollars of contracted work and a count of dwellings. Each is standardised against its own history before combination, so the node compares each input to itself rather than to the other.
  • One input dominates the composite. The work-yet-to-be-done measure sits far further above its own average than the spread does above its own, so the composite largely follows the first. An equal weighting does not produce an equal contribution.
  • Values are not inflation-adjusted. The work-yet-to-be-done measure is a dollar value in nominal terms, so part of its rise over a long window reflects construction cost inflation rather than physical volume.
  • Signed direction. This component enters the index negated: a more congested pipeline is an adverse condition for investment, on the reading that committed but undelivered work is supply not yet received. Its signed position of 0.0 is the floor of this node's own recorded range, not an absent value — the same quarter that reads highest on intensity reads lowest once the direction is applied.
  • Comparison basis. The position ranks this quarter against the 62 quarters in which both inputs are present. That full-coverage basis is the ratified one across the 24700 series; the all-rows basis is retired.
8Certification
APN Codex Node 24744 — Certified
  • Certified 10 September 2026 as a component of Supply Pipeline Conditions (24740), entering that branch at equal weight with its three siblings
  • Intensity reading 100.0 and signed reading 0.0, both ranked against 62 full-coverage quarters at the June quarter 2026 (recomputed 7 October 2026)
  • Enters the index negated: a more congested pipeline is an adverse condition for investment
  • The signed reading of 0.0 is the floor of this node's own recorded range and is not an absent value
  • The work-yet-to-be-done input covers total building, the ratified scope for this node, and is not interchangeable with the residential-only measures of the 21500 series
  • Both inputs hold sufficient observations and carry no short-history qualification.
  • Findings are presented on the basis of data and evidence alone.