APN Codex Node 21520 21500 Series — Construction & Development Pipeline Analysis

New Housing Supply Forecasts

Vectors
3
Weighting
0.25 / 0.25 / 0.50
Terminal
Q2 2026
Current Z
+1.8868σ
Position
100.0 of 168 qtrs
1Node Definition

New Housing Supply Forecasts (21520) measures the depth and throughput of the residential construction pipeline already in motion — the stock of dwellings currently under construction, the residential-only dollar value of work still to be completed on projects already underway, and the residential-only value of construction work actually completed each quarter. Where Building Approvals & Commencements (21510) measures the rate new supply enters the pipeline, New Housing Supply Forecasts (21520) measures how much supply is already inside it, how far from completion that supply sits, and how much of it is being delivered.

The node’s Work Yet To Be Done and Work Done vectors are scoped to residential building activity only, distinct from total building activity, which also includes commercial, industrial and institutional construction.

2Metric Definition

Primary metric: Node Composite Z-Score (Z21520)

Composite Z-Score Construction
Current (Q2 2026)+1.8868σ
Z DUCDwellings Under Construction Z-score (ABS 8752.0), 248,733 units, Q2 2026
Z WYTBDResidential Work Yet To Be Done Z-score (ABS 8752.0), $84,731.426m, Q2 2026
Z CWDResidential Construction Work Done Z-score (ABS 8755.0), $29,451.558m, Q2 2026

Metric typology: weighted three-vector composite index. Each vector is normalised against its own 15-year baseline and expressed as an independent Z-score. The composite weights each economic dimension of the pipeline equally: the pipeline queued — dwellings under construction and work yet to be done, 0.25 each — and pipeline throughput — work done, 0.50.

Measurement character. The Work Yet To Be Done vector reflects residential-only construction activity, against a baseline of μ = $41,997.20m, σ = $15,178.70m. The Work Done vector is the seasonally adjusted, chain-volume measure of residential construction work completed in the quarter.

3Data Sources

All three vectors are Tier-1 sovereign sources; no commercial data dependency exists in the node.

VectorSeriesSourceμσN
Dwellings Under ConstructionABS 8752.0 Table 76ABS (quarterly)198,222.7236,666.981560
Work Yet To Be Done (Residential)ABS 8752.0 Table 50ABS (quarterly)$41,997.20m$15,178.70m60
Construction Work Done (Residential)ABS 8755.0 Table 3ABS (quarterly, seasonally adjusted, chain volume)$24,847.51m$2,745.18m60
4Baseline Statistics & Current Reading

Baseline period: 15-year window, 2011 to 2025  ·  Frequency: Quarterly  ·  N: 60 per vector

Dwellings Under Construction
248,733
Z = +1.3775σ, Q2 2026
Work Yet To Be Done (Residential)
$84,731.4m
Z = +2.8154σ, Q2 2026
Work Done (Residential)
$29,451.6m
Z = +1.6771σ, Q2 2026
Node 21520 · Inputs
Input Z-Scores, June Quarter 2026

The gold shape is each input’s Z-score in the June quarter 2026: dwellings under construction +1.3775σ, residential work yet to be done +2.8154σ and residential work done +1.6771σ. The grey dashed ring marks 0σ, each input’s baseline average. Dwellings under construction and residential work yet to be done each carry one-quarter of the node’s weight, and residential work done one-half.

New Housing Supply Forecasts (21520) · Reading History
Node Z-Score by Quarter, March 2011 to June 2026
+1.8868σ · position 100.0, ranked against 168 quarters
Reading, ranked quartersNormal range (middle 80% of ranked quarters)Current reading

The June quarter 2026 reading, +1.8868σ, is the highest of the 168 ranked quarters (position 100.0) and sits above the normal range of −4.0190σ to +0.6374σ. Its ranking population runs from September 1984, when readings sat near −4σ; that early history is why the normal range reaches below the chart window’s readings. The quarters before March 2011 are listed in the data table.

Show the data
QuarterReadingBasis
Q3 1984−4.1364σRanked
Q4 1984−4.0597σRanked
Q1 1985−4.0414σRanked
Q2 1985−4.0445σRanked
Q3 1985−3.9775σRanked
Q4 1985−4.0437σRanked
Q1 1986−4.1186σRanked
Q2 1986−4.2163σRanked
Q3 1986−4.3096σRanked
Q4 1986−4.3903σRanked
Q1 1987−4.3753σRanked
Q2 1987−4.3719σRanked
Q3 1987−4.3466σRanked
Q4 1987−4.2240σRanked
Q1 1988−4.0132σRanked
Q2 1988−3.9062σRanked
Q3 1988−3.5917σRanked
Q4 1988−3.4434σRanked
Q1 1989−3.3233σRanked
Q2 1989−3.2270σRanked
Q3 1989−3.3154σRanked
Q4 1989−3.5259σRanked
Q1 1990−3.6328σRanked
Q2 1990−3.7970σRanked
Q3 1990−3.8968σRanked
Q4 1990−3.9858σRanked
Q1 1991−4.0327σRanked
Q2 1991−4.1274σRanked
Q3 1991−4.1795σRanked
Q4 1991−4.0651σRanked
Q1 1992−3.9922σRanked
Q2 1992−3.8551σRanked
Q3 1992−3.7091σRanked
Q4 1992−3.6657σRanked
Q1 1993−3.5964σRanked
Q2 1993−3.5860σRanked
Q3 1993−3.4452σRanked
Q4 1993−3.4540σRanked
Q1 1994−3.4219σRanked
Q2 1994−3.1954σRanked
Q3 1994−3.0804σRanked
Q4 1994−3.1181σRanked
Q1 1995−3.2900σRanked
Q2 1995−3.4610σRanked
Q3 1995−3.5904σRanked
Q4 1995−3.8678σRanked
Q1 1996−3.9312σRanked
Q2 1996−3.9451σRanked
Q3 1996−3.9919σRanked
Q4 1996−3.9430σRanked
Q1 1997−3.8064σRanked
Q2 1997−3.7159σRanked
Q3 1997−3.6017σRanked
Q4 1997−3.4344σRanked
Q1 1998−3.2890σRanked
Q2 1998−3.1627σRanked
Q3 1998−3.1644σRanked
Q4 1998−3.0702σRanked
Q1 1999−3.1034σRanked
Q2 1999−3.0670σRanked
Q3 1999−2.9107σRanked
Q4 1999−2.7763σRanked
Q1 2000−2.4557σRanked
Q2 2000−1.9701σRanked
Q3 2000−3.3558σRanked
Q4 2000−3.6347σRanked
Q1 2001−3.6403σRanked
Q2 2001−3.5595σRanked
Q3 2001−3.2448σRanked
Q4 2001−2.9591σRanked
Q1 2002−2.7373σRanked
Q2 2002−2.4206σRanked
Q3 2002−2.2116σRanked
Q4 2002−2.0737σRanked
Q1 2003−2.0058σRanked
Q2 2003−2.1704σRanked
Q3 2003−2.0088σRanked
Q4 2003−1.7700σRanked
Q1 2004−1.6169σRanked
Q2 2004−1.6858σRanked
Q3 2004−1.6883σRanked
Q4 2004−1.7746σRanked
Q1 2005−1.8993σRanked
Q2 2005−1.7650σRanked
Q3 2005−1.8806σRanked
Q4 2005−2.0820σRanked
Q1 2006−2.1367σRanked
Q2 2006−2.0052σRanked
Q3 2006−2.0085σRanked
Q4 2006−1.9336σRanked
Q1 2007−1.8602σRanked
Q2 2007−1.9709σRanked
Q3 2007−1.9267σRanked
Q4 2007−1.9104σRanked
Q1 2008−1.7567σRanked
Q2 2008−1.6477σRanked
Q3 2008−1.6120σRanked
Q4 2008−1.7700σRanked
Q1 2009−1.9491σRanked
Q2 2009−2.0673σRanked
Q3 2009−1.9821σRanked
Q4 2009−1.9628σRanked
Q1 2010−1.7270σRanked
Q2 2010−1.3118σRanked
Q3 2010−1.4450σRanked
Q4 2010−1.4777σRanked
Q1 2011−1.4600σRanked
Q2 2011−1.5803σRanked
Q3 2011−1.6471σRanked
Q4 2011−1.7088σRanked
Q1 2012−1.7950σRanked
Q2 2012−1.8426σRanked
Q3 2012−1.6829σRanked
Q4 2012−1.5059σRanked
Q1 2013−1.5218σRanked
Q2 2013−1.4438σRanked
Q3 2013−1.3660σRanked
Q4 2013−1.3293σRanked
Q1 2014−1.0030σRanked
Q2 2014−0.8949σRanked
Q3 2014−0.7977σRanked
Q4 2014−0.5973σRanked
Q1 2015−0.2195σRanked
Q2 2015−0.2484σRanked
Q3 2015+0.0012σRanked
Q4 2015+0.2076σRanked
Q1 2016+0.5463σRanked
Q2 2016+0.6409σRanked
Q3 2016+0.6359σRanked
Q4 2016+0.7709σRanked
Q1 2017+0.5697σRanked
Q2 2017+0.5636σRanked
Q3 2017+0.6020σRanked
Q4 2017+0.6158σRanked
Q1 2018+0.8610σRanked
Q2 2018+1.0280σRanked
Q3 2018+0.9755σRanked
Q4 2018+0.8336σRanked
Q1 2019+0.6206σRanked
Q2 2019+0.3544σRanked
Q3 2019+0.2012σRanked
Q4 2019−0.0769σRanked
Q1 2020−0.0953σRanked
Q2 2020−0.3129σRanked
Q3 2020−0.3129σRanked
Q4 2020−0.0666σRanked
Q1 2021+0.1416σRanked
Q2 2021+0.4220σRanked
Q3 2021+0.5296σRanked
Q4 2021+0.5425σRanked
Q1 2022+0.6471σRanked
Q2 2022+0.4533σRanked
Q3 2022+0.5431σRanked
Q4 2022+0.6211σRanked
Q1 2023+0.6759σRanked
Q2 2023+0.7598σRanked
Q3 2023+0.6780σRanked
Q4 2023+0.4421σRanked
Q1 2024+0.5229σRanked
Q2 2024+0.5504σRanked
Q3 2024+0.6296σRanked
Q4 2024+0.7096σRanked
Q1 2025+0.9120σRanked
Q2 2025+0.9600σRanked
Q3 2025+1.2312σRanked
Q4 2025+1.5088σRanked
Q1 2026+1.6637σRanked
Q2 2026+1.8868σRanked
5Analytical Interpretation

At +1.8868σ (Q2 2026), the composite indicates a construction pipeline running materially above its 15-year historical depth, and higher than in any earlier quarter of its record. The Work Yet To Be Done vector (+2.8154σ, $84.7 billion) is the strongest of the three signals — residential builders are carrying a larger backlog of contracted, unfinished work relative to history than either the stock of dwellings under construction (+1.3775σ, 248,733 dwellings, itself the highest on record) or the quarterly value of work actually completed (+1.6771σ) would suggest on their own. Work done is itself running above its mean, so the backlog is not the product of a stalled sector: output is elevated, and the value of work still queued behind it is elevated further. Read together with Building Approvals & Commencements (21510), where the front-of-pipeline flow has risen to about half a standard deviation above its own mean, the combination points to an existing pipeline that is deep, costly to complete and slow to clear, and that is still being added to.

Position. 100.0, ranked against 168 quarters of the node’s record in which all three inputs are present: the current reading is the highest in that record, so the Z-score is the more informative of the two figures.

6Related 24000-Series Readings
ReadingNodeRelationship
Work In Progress24743Reads the same ABS count of dwellings under construction (Total Sectors, ABS 8752.0) that forms one of this node’s three inputs
Supply Pipeline Conditions24740The branch of the APN Investment Conditions Index™ (24700) that holds the reading above

This node is not itself an input to any 24000-series instrument. The reading above draws on one of its source series, so it moves with part of this node’s input. Pipeline Congestion (24744), in the same branch, reads the value of total building work yet to be done, residential and non-residential together; this node reads the residential value only, so the two are different measures.

8Certification Statement

New Housing Supply Forecasts (21520) holds Active status. All three vectors and the composite are certified against Tier-1 ABS sources. The Work Yet To Be Done and Work Done vectors are scoped to residential-only construction activity throughout.