---
title: "APN Queensland: What the Desk Covers and What It Will Report"
url: https://australianproperty.network/insight/regional-state-level-insight/queensland-insight/apn-queensland-what-the-desk-covers/
date: 2026-10-27
modified: 2026-10-27
lang: en
author: "APN Queensland"
description: "APN Queensland reads the elements that lead to property prices in the state, upstream of price: building capacity, the one-million-homes target, five state measures and forward agenda."
categories:
  - "Queensland Insight"
tags:
  - "22230"
  - "APN State Desks"
  - "Queensland"
image: https://australianproperty.network/wp-content/uploads/2026/10/APN-Queensland-desk-October-2026.webp
word_count: 3178
---

# APN Queensland: What the Desk Covers and What It Will Report

#### APN Queensland: What the Desk Covers and What It Will Report

APN 22000 Series  ·  [22230 Queensland Insight](https://australianproperty.network/apn-codex/series-20000/series-22000/series-22200/series-22230/)
Desk introduction  ·  Readings at the June quarter 2026 (State Supply Adequacy, March quarter 2026)  ·  Reference I-261026-154179
Data anchors
[State Labour Conditions (21234)](https://australianproperty.network/apn-codex/series-20000/series-21000/series-21200/21230-employment-gdp/21234-state-labour-conditions/), Queensland  **+0.9007σ** Q2 2026
[Public Investment Intensity (21810)](https://australianproperty.network/apn-codex/series-20000/series-21000/series-21800/21810-public-investment-intensity/), Queensland  **+0.3546σ** Q2 2026
[State Price-to-Earnings (21820)](https://australianproperty.network/apn-codex/series-20000/series-21000/series-21800/21820-state-price-to-earnings/), Queensland  **+2.6377σ** Q2 2026
[State Supply Adequacy (21830)](https://australianproperty.network/apn-codex/series-20000/series-21000/series-21800/21830-state-supply-adequacy/), Queensland  **+0.4557σ** Q1 2026
[State Completion Lag (21840)](https://australianproperty.network/apn-codex/series-20000/series-21000/series-21800/21840-state-completion-lag/), Queensland  **+1.7579σ** Q2 2026
Each reading compares Queensland with its own history, in standard deviations from its 2011 to 2025 average.

##### Scope and Purpose

APN Queensland is Australian Property Network’s desk for the state. It examines what lies behind the prices at which homes in Queensland sell and the rents at which they let, and reports on each of the conditions that lead to them as the evidence develops. In Queensland the desk begins with building capacity: the state is starting far more homes than it is finishing.

The elements that lead to price form a chain. Money and credit set what buyers and builders can borrow. People, through population, migration, households, jobs and incomes, set the demand for homes. Land, the cost to build, tax and regulation, and public investment set what can be built and at what cost. The supply pipeline turns approvals into completed homes. Behaviour, including the mix of investors and owner-occupiers, shapes who buys. Price and rent are read last, as the result of the eight links before them.

Most of the upstream levers are held by state governments, which is why each state and territory has its own desk. The table sets out where the Queensland Government holds each lever.

| Link | What it covers | Where the state holds the lever |
| ---- | -------------- | ------------------------------- |
| 1. Money and credit | interest rates, lending and the terms on which buyers and builders borrow | Shared: interest rates are set nationally; the state’s Boost to Buy shared equity scheme reduces what some first home buyers borrow |
| 2. People | population, migration, households, jobs and incomes | Partly: migration is a Commonwealth power; the state forecasts population and plans where growth is housed |
| 3. Land | zoning, rezoning, land release and land values | The state: planning law, priority development areas, land activation and the infrastructure funds that make land usable |
| 4. Cost to build | materials, labour, productivity and the cost of finance during construction | Partly: the building regulator, procurement policy and training; materials, labour and insurance are set in the market |
| 5. Tax and regulation | transfer duty, land tax, surcharges, tenancy law and building law | The state: transfer duty and its first-home concessions, land tax, foreign surcharges, insurance duty and tenancy law |
| 6. Public investment | transport, water, schools, hospitals and the enabling works that make land usable | Largely the state: transport, water, the 2032 Games venues and villages, and disaster recovery with the Commonwealth |
| 7. Supply pipeline | approvals, commencements, dwellings under construction and completions | The state sets the one-million-homes target; private builders deliver most homes |
| 8. Behaviour | sentiment, the mix of investors and owner-occupiers, and finance taken up | Partly: concessions and grants change who buys |
| 9. Outcome | price and rent, read as the result of the eight links before it | No direct lever; the outcome of the links above |
APN summary of the division of powers as it bears on housing in Queensland. “Shared” and “partly” mark links where the Commonwealth or the market also acts.

##### The Bodies the Desk Follows

- Queensland Treasury, whose [2026–27 Budget Papers](https://budget.qld.gov.au/budget-papers/) and [Mid-Year Fiscal and Economic Review](https://www.treasury.qld.gov.au/files/mid-year-fiscal-and-economic-review-2025-26.pdf) carry the housing measures, the tax revenue outlook and the capital program.- The [Queensland Revenue Office](https://qro.qld.gov.au/), which collects transfer duty, land tax, foreign surcharges and insurance duty and administers first-home concessions.- The [Residential Tenancies Authority](https://www.rta.qld.gov.au/), which holds rental bonds, publishes rents and enforces tenancy law.- The [Queensland Audit Office](https://www.qao.qld.gov.au/), whose reports cover the major projects program, the 2032 Games and social housing.- The [Queensland Government Statistician’s Office](https://www.qgso.qld.gov.au/), which publishes the state’s population estimates and dwelling projections.- The [Queensland Reconstruction Authority](https://www.qra.qld.gov.au/), which administers disaster recovery and resilience funding.

##### Where Queensland Stands

Five APN measures read each state and territory against its own history; they are set out on the [State & Territory Conditions (21800)](https://australianproperty.network/apn-codex/series-20000/series-21000/series-21800/) page. Each is expressed in standard deviations from the state’s 2011 to 2025 average, and its position ranks the latest quarter against every earlier quarter with full data.

##### Queensland: Five State Measures Against the State’s Own History

- −4σ−3σ−2σ−1σ0σ1σ2σ3σ4σState Price-to-Earnings (21820)2.64σState Completion Lag (21840)1.76σState Labour Conditions (21234)0.90σState Supply Adequacy (21830)0.46σPublic Investment Intensity (21810)0.35σ
APN calculation based on Australian Bureau of Statistics data. Each reading is in standard deviations from the state’s own 2011 to 2025 average: State Labour Conditions, higher means a tighter labour market; Public Investment Intensity, higher means more public investment relative to the state economy; State Price-to-Earnings, higher means dwellings dearer relative to earnings; State Supply Adequacy, higher means population growing faster than the dwelling stock; State Completion Lag, higher means completion lags lengthening. June quarter 2026, except State Supply Adequacy (21830), March quarter 2026. Gold bars are above the state’s average and slate bars below.

Queensland’s readings are high against its own history on three of the five measures. [State Completion Lag (21840)](https://australianproperty.network/apn-codex/series-20000/series-21000/series-21800/21840-state-completion-lag/) reads +1.7579σ, position 97.5, ranked against 161 quarters. Dwellings under construction in Queensland equalled 18.2 months of completions at June 2026, up from 14.7 months a year earlier. Completions over the four quarters to June 2026 were 34,627, +2.2% on the previous four quarters, and commencements were 45,865, +26.0%. Commencements rose by about a quarter while completions barely moved. The completion lag lengthened more in Queensland than in any other state or territory, against its own history.

##### Change in Months of Pipeline over the Year to June 2026

−4−20246Western Australia5.5Australian Capital Territory4.8Queensland ●3.6Tasmania1.3South Australia0.8Victoria0.3New South Wales−2.3Northern Territory−2.4
State Completion Lag (21840). APN calculation based on Australian Bureau of Statistics data. Dwellings under construction at the end of the quarter divided by a month of completions averaged over four quarters, from ABS Building Activity, Tables 38 and 77, original; June 2026 less June 2025. Gold bars are lengthening pipelines and slate bars shortening ones. The dot marks Queensland.

Queensland Treasury reports in [Budget Paper No. 2](https://budget.qld.gov.au/files/2026-27-budget-bp2-budget-strategy-outlook.pdf) that a new house took an average of 7.1 months to build in 2024–25, the fastest of the states. The two measures answer different questions. The Treasury figure is the time to build one house; the completion lag reads the whole stock under construction against the pace at which homes are finished, and that stock grew faster than completions over the year.

[State Price-to-Earnings (21820)](https://australianproperty.network/apn-codex/series-20000/series-21000/series-21800/21820-state-price-to-earnings/) reads +2.6377σ, position 98.2, ranked against 57 quarters. The mean dwelling in Queensland cost 10.65 years of full-time adult ordinary-time earnings at June 2026, against 9.63 years a year earlier. Prices grew faster than earnings over the year, by 11.00 percentage points. Queensland’s reading is the second highest of the eight, after Western Australia’s. Its mean dwelling price, $1,130.6 thousand at June 2026 on the ABS measure, is the second highest after New South Wales and rose 15.4% over the year. First home buyers took 32.0% of owner-occupier loan commitments in the June quarter 2026, the lowest share of the eight (ABS Lending Indicators).

##### Years of Full-Time Earnings to Buy the Mean Dwelling, June Quarter 2026

02468101214New South Wales11.90Queensland ●10.65Western Australia9.70South Australia9.56Victoria8.65Australian Capital Territory8.23Tasmania7.64Northern Territory5.96
State Price-to-Earnings (21820). APN calculation based on Australian Bureau of Statistics data. Mean dwelling price from ABS Total Value of Dwellings divided by a year of full-time adult ordinary-time earnings from ABS Average Weekly Earnings, seasonally adjusted; earnings for June 2026 are those of May 2026. The dot marks Queensland.

[State Labour Conditions (21234)](https://australianproperty.network/apn-codex/series-20000/series-21000/series-21200/21230-employment-gdp/21234-state-labour-conditions/) reads +0.9007σ at the June quarter 2026, position 67.8, ranked against 60 quarters: the employed share of the labour force was 95.67% and the job vacancy rate 2.03%. Queensland’s is the highest labour reading of the eight. [State Supply Adequacy (21830)](https://australianproperty.network/apn-codex/series-20000/series-21000/series-21800/21830-state-supply-adequacy/) reads +0.4557σ at the March quarter 2026, position 64.8, ranked against 55 quarters: population grew 1.59% over the year and the dwelling stock 1.42%, so population grew faster than the stock. [Public Investment Intensity (21810)](https://australianproperty.network/apn-codex/series-20000/series-21000/series-21800/21810-public-investment-intensity/) reads +0.3546σ, position 39.0, ranked against 165 quarters: public investment was 5.83% of state final demand over the four quarters to June 2026. Public investment sits below the middle of Queensland’s own history, although the state is preparing for the 2032 Games.

##### Five Questions Every State Is Working On

Five housing questions appear in the published documents of every state and territory: delivery against a housing target, planning reform, tenancy law, social housing, and first-home-buyer settings. Each answers them through its own instruments. In Queensland:

**Delivery against the target.** The state’s housing plan targets one million new homes from 2024 to 2044, including 53,500 social and community homes, supported by a $2 billion Residential Activation Fund ([ministerial statement, 21 March 2025](https://statements.qld.gov.au/statements/102215); [Budget Paper No. 2](https://budget.qld.gov.au/files/2026-27-budget-bp2-budget-strategy-outlook.pdf)). The target averages 50,000 homes a year; completions over the four quarters to June 2026 were 34,627, about 69% of that pace.- **Planning reform.** The [Housing Availability and Affordability (Planning and Other Legislation Amendment) Act 2024](https://www.legislation.qld.gov.au/view/pdf/asmade/act-2024-013) added a state facilitated development pathway. The government’s response to the Queensland Productivity Commission noted, and did not adopt, the Commission’s recommendation to set minimum zoning allowances.- **Tenancy law.** The [Residential Tenancies and Rooming Accommodation and Other Legislation Amendment Act 2024](https://legislation.qld.gov.au/view/pdf/asmade/act-2024-027) limits how often rent can rise and tightens the evidence needed for bond claims. Treasury put the rental vacancy rate at 1.0% in May 2026.- **Social housing.** The [Queensland Audit Office](https://www.qao.qld.gov.au/sites/default/files/2026-06/Follow-up%20audit%20%E2%80%93%20Delivering%20social%20housing%20services%20%28Report%2016%20%E2%80%93%202025%E2%80%9326%29.pdf) counted 32,848 applications on the social housing register at 31 December 2025, 30% more than in June 2024; the department attributes part of the rise to less frequent review of the register in 2025.- **First-home-buyer settings.** First home buyers of a new home pay no transfer duty, with no price cap, on contracts from 1 May 2025, and from 1 August 2026 the concession is limited to citizens, permanent residents and specified retirees ([Queensland Revenue Office](https://qro.qld.gov.au/duties/transfer-duty/concessions/homes/first-home-new/)). The $30,000 First Home Owner Grant for new homes continues.

##### Building Capacity, the Games and Disaster Costs

The state’s own documents point to building capacity. The government’s [response to the Queensland Productivity Commission](https://www.treasury.qld.gov.au/files/QPC-Construction-Industry-Response.pdf) records construction productivity down 9% since 2018 and removed the Best Practice Industry Conditions from state procurement from 1 January 2026. The [Queensland Audit Office](https://www.qao.qld.gov.au/sites/default/files/2025-12/Major%20projects%202025%20(Report%208%20%E2%80%93%202025%E2%80%9326).pdf) cites a Construction Skills Queensland estimate of a shortfall averaging 18,200 construction workers over eight years, peaking at 50,000 in 2026–27, with Games infrastructure drawing on the same workforce.

The 2032 Games carry a $7.1 billion venue program ([ministerial statement, 25 March 2025](https://statements.qld.gov.au/statements/102237)) and $3.5 billion set aside for athletes’ villages, and the Audit Office found 11 of 17 venues still in business case processes at 30 June 2025. In the published data the program is not yet visible in public investment as a share of the state economy; the desk will read the Games capital lines in each budget against that measure.

Disaster costs are the other state-specific link. Budget Paper No. 2 puts disaster expenses at $8,845 million in 2025–26. The Insurance Council of Australia reports more than $4.1 billion of the $4.8 billion in insured weather losses in 2025 arising in Queensland ([release, 21 April 2026](https://insurancecouncil.com.au/resource/hail-events-push-extreme-weather-costs-to-4-8-billion-in-2025/)). The desk will read insurance cost in Brisbane beside insured losses and the state’s disaster spending.

Most population growth comes from overseas migration. The [Queensland Government Statistician’s Office](https://www.qgso.qld.gov.au/issues/3091/population-growth-qld-202603.pdf) reports that net overseas migration supplied 61.3% of the state’s population growth in the year to March 2026 and net interstate migration 16.3%, a smaller share than a year earlier.

##### What the Desk Reads

The desk works from three bodies of evidence. The first is the Australian Bureau of Statistics (ABS), whose state tables cover building activity and approvals, the national accounts by state, population, the labour force, earnings, lending and prices. The second is the state’s own publications: the budget papers and mid-year review, Queensland Revenue Office rulings, Residential Tenancies Authority rents and bonds, the Statistician’s population releases, Audit Office reports and ministerial statements. The third is APN’s own state measures, shown above.

##### Questions the Desk Will Take Up

Beyond the five measures, the desk will report on these questions about Queensland:

- **Social housing.** The register, priority applications and waiting times, which the state publishes.- **Land supply.** Land supply and development, from the state’s own monitoring.- **Insurance and disaster cost.** Insurance cost for Brisbane, insured losses by event and the state’s disaster spending.- **Construction cost and insolvency.** Building costs and construction insolvencies in the state, read beside the ABS house construction price index for Brisbane.- **Lending by purpose.** New loan commitments to owner-occupiers, investors and first home buyers in the state, from the ABS Lending Indicators.- **Where population growth comes from.** The ABS publishes the growth of each state and territory’s population by its three sources, natural increase, overseas migration and interstate migration, every quarter. The desk will report the split for Queensland with each release.

##### Forward Agenda

The desk will report on these releases as they are published.

| Date | Release | Reference period | What the desk will look at |
| ---- | ------- | ---------------- | -------------------------- |
| 28 October 2026 | *Consumer Price Index, Australia* (ABS) | September quarter 2026 | Brisbane rents and new-dwelling purchase prices in the capital-city indexes |
| 30 October 2026 | *Producer Price Indexes, Australia* (ABS) | September quarter 2026 | Output prices of house construction in Brisbane |
| 2 November 2026 | *Building Approvals, Australia* (ABS) | September 2026 | Dwelling approvals in Queensland, ahead of the commencements count |
| 11 November 2026 | *Lending Indicators* (ABS) | September quarter 2026 | Queensland loan commitments by owner-occupiers, investors and first home buyers |
| 19 November 2026 | *Labour Force, Australia* (ABS) | October 2026 | Employment and unemployment |
| 1 December 2026 | *Total Value of Dwellings* (ABS) | September quarter 2026 | Mean dwelling price |
| 2 December 2026 | *Australian National Accounts: National Income, Expenditure and Product* (ABS) | September quarter 2026 | State final demand and public investment |
| 17 December 2026 | *National, state and territory population* (ABS) | June quarter 2026 | Population at June 2026 |
| 13 January 2027 | *Building Activity, Australia* (ABS) | September quarter 2026 | Commencements, completions and dwellings under construction |
| 25 February 2027 | *Average Weekly Earnings, Australia* (ABS) | November 2026 | Earnings for November 2026 |
Release dates as listed on each Australian Bureau of Statistics release page, read on 26 October 2026, and on the state’s own published timetable where one exists. The ABS lists both 2 and 9 November 2026 for the September issue of Building Approvals.

It also reads Queensland Treasury’s Mid-Year Fiscal and Economic Review 2026–27, whose date has not yet been published, for transfer duty revisions, disaster expenses and the Games capital program.

The desk’s regular pieces:

- **Queensland Pipeline Watch** follows each ABS Building Activity release. The next is due after 13 January 2027.- **Price Against Pay, Queensland** follows each ABS Total Value of Dwellings release, with the first-home-buyer share of lending. The next is due after 1 December 2026.- **A Quarterly Conditions Statement** follows each ABS national accounts release. The next is due after 2 December 2026.- **The Million-Homes Ledger** examines completions against the target at each budget and mid-year review.- **The Disaster and Insurance Account** is a study published at each budget, and after major events.- **State budget reviews** of the Mid-Year Fiscal and Economic Review and the 2027–28 Budget.

##### What the Desk Does Not Do

The Queensland desk does not forecast prices, rents or any other figure, and it states no expected direction for any release in its agenda. It makes no recommendation to buy, sell or hold property or any other asset. It reports what governments, regulators and organised interests say and do, with the source, and does not attribute motive to any of them. Where a figure is not published, it says so and does not estimate it.

**Methodology note.** The five state measures are APN calculations from Australian Bureau of Statistics data. State Labour Conditions (21234) is the equal-weighted mean of the employed share of the labour force and the job vacancy rate, each standardised. Public Investment Intensity (21810) is public gross fixed capital formation summed over four quarters as a share of state final demand over the same quarters, current prices. State Price-to-Earnings (21820) is the mean dwelling price divided by a year of full-time adult ordinary-time earnings; earnings are published twice a year, and the latest published figure is used until the next release. State Supply Adequacy (21830) is population growth over the year less growth in the dwelling stock over the year. State Completion Lag (21840) is the change over the year in months of pipeline, being dwellings under construction divided by a month of completions averaged over four quarters. Each is standardised against the state’s own 2011 to 2025 history. Positions are percentile ranks against every quarter in which the reading’s inputs are all present, so 0.0 is the lowest such quarter and 100.0 the highest; the number of quarters is stated with each position. Series are subject to revision at each release.

**Sources**
- Australian Bureau of Statistics (Reference period: August 2026) *Building Approvals, Australia* [[https://www.abs.gov.au/statistics/industry/building-and-construction/building-approvals-australia/latest-release](https://www.abs.gov.au/statistics/industry/building-and-construction/building-approvals-australia/latest-release)], ABS Website, accessed 26 October 2026.- Australian Bureau of Statistics (Reference period: June 2026) *Australian National Accounts: National Income, Expenditure and Product* [[https://www.abs.gov.au/statistics/economy/national-accounts/australian-national-accounts-national-income-expenditure-and-product/jun-2026](https://www.abs.gov.au/statistics/economy/national-accounts/australian-national-accounts-national-income-expenditure-and-product/jun-2026)], ABS Website, accessed 26 October 2026.- Australian Bureau of Statistics (Reference period: June 2026) *Building Activity, Australia* [[https://www.abs.gov.au/statistics/industry/building-and-construction/building-activity-australia/jun-2026](https://www.abs.gov.au/statistics/industry/building-and-construction/building-activity-australia/jun-2026)], ABS Website, accessed 26 October 2026.- Australian Bureau of Statistics (Reference period: June quarter 2026) *Lending Indicators* [[https://www.abs.gov.au/statistics/economy/finance/lending-indicators/latest-release](https://www.abs.gov.au/statistics/economy/finance/lending-indicators/latest-release)], ABS Website, accessed 26 October 2026.- Australian Bureau of Statistics (Reference period: June quarter 2026) *Total Value of Dwellings* [[https://www.abs.gov.au/statistics/economy/price-indexes-and-inflation/total-value-dwellings/jun-quarter-2026](https://www.abs.gov.au/statistics/economy/price-indexes-and-inflation/total-value-dwellings/jun-quarter-2026)], ABS Website, accessed 26 October 2026.- Australian Bureau of Statistics (Reference period: March 2026) *National, state and territory population* [[https://www.abs.gov.au/statistics/people/population/national-state-and-territory-population/mar-2026](https://www.abs.gov.au/statistics/people/population/national-state-and-territory-population/mar-2026)], ABS Website, accessed 26 October 2026.- Australian Bureau of Statistics (Reference period: May 2026) *Average Weekly Earnings, Australia* [[https://www.abs.gov.au/statistics/labour/earnings-and-working-conditions/average-weekly-earnings-australia/may-2026](https://www.abs.gov.au/statistics/labour/earnings-and-working-conditions/average-weekly-earnings-australia/may-2026)], ABS Website, accessed 26 October 2026.- Australian Bureau of Statistics (Reference period: September 2026) *Labour Force, Australia* [[https://www.abs.gov.au/statistics/labour/employment-and-unemployment/labour-force-australia/latest-release](https://www.abs.gov.au/statistics/labour/employment-and-unemployment/labour-force-australia/latest-release)], ABS Website, accessed 26 October 2026.- Insurance Council of Australia *Media release on insured weather losses in 2025 (21 April 2026)* [[https://insurancecouncil.com.au/resource/hail-events-push-extreme-weather-costs-to-4-8-billion-in-2025/](https://insurancecouncil.com.au/resource/hail-events-push-extreme-weather-costs-to-4-8-billion-in-2025/)], accessed 26 October 2026.- Queensland Audit Office *Follow-up audit: Delivering social housing services (Report 16: 2025–26, 19 June 2026)* [[https://www.qao.qld.gov.au/sites/default/files/2026-06/Follow-up%20audit%20%E2%80%93%20Delivering%20social%20housing%20services%20%28Report%2016%20%E2%80%93%202025%E2%80%9326%29.pdf](https://www.qao.qld.gov.au/sites/default/files/2026-06/Follow-up%20audit%20%E2%80%93%20Delivering%20social%20housing%20services%20%28Report%2016%20%E2%80%93%202025%E2%80%9326%29.pdf)], accessed 26 October 2026.- Queensland Audit Office *Major projects 2025 (Report 8: 2025–26, 17 December 2025)* [[https://www.qao.qld.gov.au/sites/default/files/2025-12/Major%20projects%202025%20(Report%208%20%E2%80%93%202025%E2%80%9326).pdf](https://www.qao.qld.gov.au/sites/default/files/2025-12/Major%20projects%202025%20(Report%208%20%E2%80%93%202025%E2%80%9326).pdf)], accessed 26 October 2026.- Queensland Government *$2 billion Residential Activation Fund (joint ministerial statement, 21 March 2025)* [[https://statements.qld.gov.au/statements/102215](https://statements.qld.gov.au/statements/102215)], accessed 26 October 2026.- Queensland Government *Delivering 2032 and Beyond (joint ministerial statement, 25 March 2025)* [[https://statements.qld.gov.au/statements/102237](https://statements.qld.gov.au/statements/102237)], accessed 26 October 2026.- Queensland Government Statistician’s Office *Population growth, Queensland, March quarter 2026* [[https://www.qgso.qld.gov.au/issues/3091/population-growth-qld-202603.pdf](https://www.qgso.qld.gov.au/issues/3091/population-growth-qld-202603.pdf)], accessed 26 October 2026.- Queensland Legislation *Housing Availability and Affordability (Planning and Other Legislation Amendment) Act 2024* [[https://www.legislation.qld.gov.au/view/pdf/asmade/act-2024-013](https://www.legislation.qld.gov.au/view/pdf/asmade/act-2024-013)], accessed 26 October 2026.- Queensland Legislation *Residential Tenancies and Rooming Accommodation and Other Legislation Amendment Act 2024* [[https://legislation.qld.gov.au/view/pdf/asmade/act-2024-027](https://legislation.qld.gov.au/view/pdf/asmade/act-2024-027)], accessed 26 October 2026.- Queensland Revenue Office *First home (new home) concession* [[https://qro.qld.gov.au/duties/transfer-duty/concessions/homes/first-home-new/](https://qro.qld.gov.au/duties/transfer-duty/concessions/homes/first-home-new/)], accessed 26 October 2026.- Queensland Treasury *Budget Measures 2026–27, Budget Paper No. 4 (23 June 2026)* [[https://budget.qld.gov.au/files/2026-27-budget-bp4-budget-measures.pdf](https://budget.qld.gov.au/files/2026-27-budget-bp4-budget-measures.pdf)], accessed 26 October 2026.- Queensland Treasury *Budget Strategy and Outlook 2026–27, Budget Paper No. 2 (23 June 2026)* [[https://budget.qld.gov.au/files/2026-27-budget-bp2-budget-strategy-outlook.pdf](https://budget.qld.gov.au/files/2026-27-budget-bp2-budget-strategy-outlook.pdf)], accessed 26 October 2026.- Queensland Treasury *Mid-Year Fiscal and Economic Review 2025–26 (December 2025)* [[https://www.treasury.qld.gov.au/files/mid-year-fiscal-and-economic-review-2025-26.pdf](https://www.treasury.qld.gov.au/files/mid-year-fiscal-and-economic-review-2025-26.pdf)], accessed 26 October 2026.- Queensland Treasury *Queensland Government response to the Queensland Productivity Commission’s construction industry report* [[https://www.treasury.qld.gov.au/files/QPC-Construction-Industry-Response.pdf](https://www.treasury.qld.gov.au/files/QPC-Construction-Industry-Response.pdf)], accessed 26 October 2026.
*ABS material is used under a Creative Commons Attribution 4.0 International licence. Calculations, standardisations and index readings are APN’s and are not attributable to the ABS.*

##### Disclaimer

The analysis and information contained in this publication are for general informational and strategic purposes only and do not constitute financial, investment, legal, or any other form of professional advice. Australian Property Network is not a licensed financial advisor. Property values and market conditions can go up or down. Before making any property or investment decisions, you must conduct your own thorough research and seek independent professional advice tailored to your specific circumstances. Images are for illustrative purposes only. E.&O.E.

Findings are presented on the basis of data and evidence alone.
<!-- WP Optimize page cache - https://teamupdraft.com/wp-optimize/ - page NOT cached -->
