---
title: "APN Research Brief: Council ‘Maintenance Squeeze’ Hits Property Values"
url: https://australianproperty.network/apn-research/apn-research-brief-council-maintenance-squeeze-hits-property-values/
date: 2026-02-02
modified: 2026-08-28
lang: en
author: "APN Academy"
description: "Queensland councils are redirecting budgets away from parks and streetscape upkeep to cover surging infrastructure and energy costs, a structural shift this brief calls the \"Maintenance Squeeze.\" Case data from Brisbane City Council and Scenic Rim Regional Council shows the withdrawal of everyday municipal maintenance is now visibly eroding the public amenity that underpins prestige property values."
word_count: 3648
---

# APN Research Brief: Council ‘Maintenance Squeeze’ Hits Property Values

APN Research Brief

# Council "Maintenance Squeeze" Hits Property Values

Queensland councils are redirecting budgets away from parks and streetscape upkeep to cover surging infrastructure and energy costs, a structural shift this brief calls the "Maintenance Squeeze." Case data from Brisbane City Council and Scenic Rim Regional Council shows the withdrawal of everyday municipal maintenance is now visibly eroding the public amenity that underpins prestige property values.

[Back to APN Research →](https://australianproperty.network/apn-research/)

1Executive Summary
This research report serves as a rigorous stress-test of the "Maintenance Squeeze" thesis, a structural economic theory positing that Local Government Authorities (LGAs) across Australia, specifically within the Queensland jurisdiction, have initiated a fundamental strategic pivot. This pivot involves a reallocation of capital and operational expenditure away from "Aesthetic Maintenance", defined as the manicuring of public streetscapes, verges, and passive recreation zones, towards "Resilience Engineering," which encompasses critical drainage, arterial road networks, and disaster mitigation infrastructure.

The core premise of this investigation is derived from the observation of a "Maintenance Gap," a fiscal disconnect where the cost of municipal inputs (bitumen, concrete, energy, and labor) has surged by approximately 30% over a multi-year period, while municipal revenue streams remain tethered to state-mandated "Rate Pegs" or politically sensitive "Rate Caps" typically ranging between 3.5% and 4.5%. This disconnect forces a "Service Prioritisation Model" that theoretically necessitates the defunding of non-critical assets.

#### The Analytical Framework: APN Bedrock™ And The Green Floor

The analysis applies two APN valuation frameworks: APN Bedrock™ and The Green Floor.

- **APN Bedrock™** asserts that for "Prestige" or "Blue Chip" residential assets, specifically those in the >$3 million median bracket, approximately 60% of the asset's realisable market value is derived not from the private allotment itself, but from the "Streetscape Amenity." This includes the quality of the public realm: the verdancy of verges, the health of street trees, the smoothness of the road surface, and the absence of visual blight.

- **The Green Floor** establishes the baseline requirement for municipal maintenance that supports this value. It posits that once the "Green Floor" (the standard of landscape maintenance) is breached due to budget cuts, the "Bedrock" value begins to erode, leading to a decoupling of the asset's price from broader market movements.

The objective of this report is to validate whether the "Service Level Adjustments" currently being enacted by councils like Brisbane City Council (BCC) and Scenic Rim Regional Council (SRRC) constitute a breach of the Green Floor, thereby triggering the "Amenity Erosion" risk profile for investors relying on Streetscape Amenity to support asset value.

2The Service Level Audit
This audit interrogates the financial and operational documents of the target councils to identify the specific terminology and budgetary mechanisms used to enact service cuts. The analysis focuses on the 2025-2026 budget cycles, a period characterised by the collision of post-inflationary cost bases and community demands for cost-of-living relief.

#### Brisbane City Council: The Strategic Pivot To "Critical" Infrastructure

The Brisbane City Council 2025-26 Budget provides the primary dataset for analysing the prioritisation model of a metropolitan "super-council." The budget outlines a massive expenditure program, yet a granular review reveals a distinct hierarchy of spending that favours "hard" infrastructure over "soft" amenities.

##### Budgetary Allocation: The Hard vs. Soft Split

The financial allocation in the 2025-26 budget illustrates a clear dominance of transport and infrastructure engineering over parks and aesthetic maintenance.

- **Infrastructure & Transport Dominance:** The budget allocates a staggering **$1.428 billion** to "Public Transport" and **$899.8 million** to "Infrastructure".1 This investment is heavily skewed towards major capital projects, including the "Brisbane Metro" and the "New Bus Network," which are framed as essential for "Keeping Brisbane Moving".1

- **The Environment & Parks Lag:** In contrast, the "Environment, Parks and Sustainability" program receives **$733.5 million**.1 While substantial in absolute terms, this figure must cover a vast array of operational requirements, including waste management (a high-cost, non-discretionary service), vegetation management across 70,000 hectares, and sustainability initiatives.2 When adjusted for the inflationary costs of waste disposal levies and labour, the real purchasing power of this allocation for *aesthetic* maintenance is under significant pressure.

| **Brisbane City Council Program Area (2025-26)** | **Allocated Funding ($ Millions)** | **Strategic Priority Classification** |
| ------------------------------------------------ | ---------------------------------- | ------------------------------------- |
| Public Transport | $1,428.0 | Critical / Resilience |
| Infrastructure | $899.8 | Critical / Resilience |
| Environment, Parks and Sustainability | $733.5 | Aesthetic / Compliance |
| Finance and City Governance | $508.8 | Operational |
| Customer Services | $226.4 | Service Delivery |
| City Planning & Suburban Renewal | $164.7 | Planning |
| Community and the Arts | $141.3 | Discretionary |

##### Service Level Adjustments And "Operational Smoothing"

The terminology used in BCC's operational planning documents reveals the mechanism of the squeeze. The "Annual Operational Plan" (AOP) serves as the vehicle for aligning service delivery with the "Long-Term Financial Forecast" (LTFF).3

- **Deferral of "Open Space" Spending:** The Quarterly Financial Report (September 2025) explicitly notes discrepancies in the timing of expenses. Expenses in the "Safe and Resilient City" outcome, which relates to disaster management and critical response, were "accelerated".5 Conversely, expenses in the "Open Space Management" outcome, specifically relating to "parks operations, roadside landscape maintenance, trees and parks maintenance", were flagged for timing adjustments to "materially align with the annual budget".5

- **Interpretation:** In municipal finance, the "timing" of maintenance expenses is a primary lever for cost control. By delaying "parks maintenance" and "roadside landscape" work, the council effectively reduces the frequency of service cycles (e.g., stretching a mowing cycle from 2 weeks to 3 weeks) to retain cash flow for "accelerated" resilience spending. This confirms the hypothesis that "Passive Recreation Zones" are the variable in the equation, while "Resilience" is the constant.

##### The "Grass Cutting" Political Friction

The reality of these service level adjustments is further validated by the friction observed in Council Chambers. Minutes from meetings in late 2024 and early 2025 record heated debates regarding the "grass cutting schedule".6

- **The Weather Excuse vs. Structural Deficit:** Opposition councillors have accused the administration of using "wet weather" as a justification for cuts to the grass cutting schedule, noting that even when contractors were deployed, the quality of work destroyed park assets ("destroy Brisbane parks").7

- **Specific Complaints:** The minutes record that the LNP administration "justified cuts to the grass cutting schedule," leading to a situation where residents were "sick of seeing their rates... being wasted" while suburbs degraded.7 This political discourse confirms that the reduction in aesthetic maintenance is not merely a bureaucratic adjustment but a visible issue affecting resident sentiment.

#### Scenic Rim Regional Council: The Austerity Model

The Scenic Rim Regional Council (SRRC) provides a case study of a regional LGA facing an even more acute version of the squeeze. With a smaller rate base and a vast road network to maintain, the SRRC has been forced into explicit "asset rationalisation."

##### The Rate Cap Collision

The 2025-2026 budget process for SRRC was defined by a collision between fiscal reality and community capacity to pay.

- **The Initial Ask:** The council initially proposed a **7% rate increase** to cover the surging costs of inputs and waste levies.8

- **The Compromise:** Following intense community feedback regarding the "cost of living," the council was forced to adopt a lower **4.5% average increase**.8

- **The Consequence:** This 2.5% revenue shortfall necessitated immediate cuts. The council explicitly stated that "some new initiatives and community projects will be placed on hold for this financial year".8

##### Quantifying The Priority Shift: Roads vs. Parks

The "Service Prioritisation Model" is starkly visible in the SRRC capital expenditure forecast. The disparity between investment in "hard" transport infrastructure and "soft" amenity is immense.

| **Scenic Rim Capital Expenditure Category (Draft 2025-26)** | **Amount ($'000)** | **Ratio to Parks Spend** |
| ----------------------------------------------------------- | ------------------ | ------------------------ |
| Roads (Capital) | $15,120 | 48.1 : 1 |
| Bridges | $3,390 | 10.8 : 1 |
| Facilities | $2,685 | 8.5 : 1 |
| Waste Management | $1,235 | 3.9 : 1 |
| Drainage | $859 | 2.7 : 1 |
| **Parks and Landscape Maintenance** | **$314** | **1 : 1** |

Source: Scenic Rim Regional Council Budget Documents 9

**Analysis:** The allocation of only **$314,000** for capital works in Parks and Landscape Maintenance, compared to **$15.1 million** for roads, represents a near-total defunding of aesthetic improvement. In a region that markets itself on "Spectacular Scenery" 11, this withdrawal of investment in the public realm validates the "Amenity Erosion" risk. The focus is entirely on keeping the road network functional (Resilience Engineering) at the expense of the visual environment.

##### The "Deferred Projects" List

The investigation identified specific evidence of projects being "deferred" or "placed on hold" due to budget constraints.

- **Biosecurity and Biodiversity Deferrals:** Projects related to the "Scenic Rim Regional Council Biodiversity Strategy 2015-2025" were flagged as "Project deferred due to higher priority items arising" in quarterly reports.12

- **Capital Works Deferrals:** Specific initiatives, such as the "Automatic Gate System" trial at waste facilities, were rejected or deferred because they did not meet the original scope or budget availability.13

- **Community Grants:** While some small grants proceeded (e.g., $75,000 for the Scenic Rim Trail event 14), the broader narrative is one of "limited funding opportunities" where the council is "challenged to do more with less".15

#### Synthesis: The Service Level Audit

The "Service Level Audit" confirms the thesis. Both Brisbane City Council and Scenic Rim Regional Council have adopted a "Service Prioritisation Model" that explicitly favours critical infrastructure over aesthetic maintenance.

- **Brisbane:** Uses "operational smoothing" and "timing adjustments" to mask reduced frequencies in grass cutting and landscape maintenance, prioritising the $1.4bn Metro project.

- **Scenic Rim:** Forced by a rate cap compromise to explicitly "hold" community projects and allocate capital to roads over parks at a ratio of 48:1.

3The Input Inflation Index
This section quantifies the "Maintenance Gap" by analysing the disparity between the inflation of municipal input costs (the "Input Inflation" Index) and the revenue constraints imposed by rate caps.

#### The "Bitumen Inflation" Reality

The cost of civil construction, the primary activity of any council, has historically outpaced general inflation. While the most recent data for the "Council Cost Index" (CCI) in Queensland shows a moderation to **3.13%** for 2025 16, this figure must be contextualised against the cumulative impact of previous years.

- **Cumulative Shock:** The CCI recorded an **8.11%** increase in 2023 and **3.74%** in 2024.16 This means the *baseline* cost for road and bridge construction is permanently elevated. A moderation to 3.13% does not reverse the previous 12% hike; it merely slows the rate of further increase.

- **Material Escalation:** Analysis of the "Road and Bridge Construction Index" used by SRRC shows it running at **3.5%**, slightly above the general CPI.15 However, specific components of this index are highly volatile.

#### The Energy Linchpin: A 23.6% Surge

The most critical finding in this section is the role of energy markets as a driver of municipal insolvency. Energy is the "linchpin" between inflation and material pricing.17

- **The Data:** Electricity prices surged by **23.6%** over the year to late 2025, with a quarterly jump of **9%** in Q3 2025 alone.17

- **The Mechanism:** High energy costs feed directly into the production of energy-intensive materials such as **cement, aluminium, and copper**.17 For a council, this impacts everything from the cost of concrete for footpaths to the electricity bill for streetlights and community pools.

- **Regional Divergence:** The data indicates that "Brisbane leads national escalation," driven by pre-Olympic construction demand, which further exacerbates the cost of materials for the local council.17

#### The "Maintenance Gap" Calculation

The "Maintenance Gap" is the mathematical inevitability of insolvency when revenue growth is capped below input inflation.

- **The Revenue Cap:** Victorian councils are capped at a **2.5%** rate increase.18 Brisbane City Council limited its owner-occupied rate increase to **3.87%**.1 Scenic Rim adopted a **4.5%** increase.8

- **The Input Cost:**

- Waste Disposal Levy: Increased from $115 to **$125 per tonne** (+8.7%).9

- State Waste Reimbursement: Reduced from 85% to **70%**.9

- Electricity: **+23.6%**.17

- Construction Costs: **+3.5%**.15

**The Calculation:**

If a council's cost base is weighted 40% to materials/construction (inflating at ~3.5-5%), 10% to energy (inflating at 23.6%), and 30% to labour (inflating at ~4%), the "Weighted Municipal Inflation" significantly exceeds the ~3.8% revenue cap.

![](https://australianproperty.network/wp-content/uploads/2026/02/image-9.png)
Using the 2025 data points:

![](https://australianproperty.network/wp-content/uploads/2026/02/image-10.png)
![](https://australianproperty.network/wp-content/uploads/2026/02/image-11.png)
![](https://australianproperty.network/wp-content/uploads/2026/02/image-12.png)
This **1.76% structural deficit**, compounding annually, is the "squeeze." It guarantees that for every year this disparity exists, the council *must* reduce service levels by approximately 2% to balance the books.

#### The Cost Shifting Multiplier

The "Maintenance Gap" is further widened by "Cost Shifting." The Local Government Association of Queensland (LGAQ) estimates that councils are absorbing a **$360 million** annual cost for responsibilities shifted from state/federal governments.19

- **Examples:** Monitoring environmental compliance 21, operating childcare centres in remote areas 20, and maintaining airports.20

- **Impact:** Every dollar spent on these "non-core" services is a dollar removed from the maintenance of the "Green Floor."

4The Visual Decay Indicator
This section applies the APN Bedrock™ framework to assess the impact of the maintenance squeeze on property values. If the "Green Floor" is breached, the "Bedrock" value of prestige assets is compromised.

#### Snap Send Solve: The Data Forensics Of Decay

The "Snap Send Solve" platform provides a real-time, crowdsourced audit of municipal performance. The 2025 dataset comprises over **201,200 real-time ratings** and **13,721 survey responses** 22, offering a statistically significant sample of resident sentiment.

- **The Spike in "Blue Chip" Complaints:** Analysis of complaint patterns indicates a rising trend in reports from premium postcodes. Residents in areas like Ascot, Hamilton (Brisbane), and comparable wealthy enclaves are increasingly reporting issues that were previously rare.

- **Overgrown Vegetation:** This is a leading category of complaint.23 In Brisbane, the "Annual Operational Plan" discussions regarding the timing of "roadside landscape maintenance" 5 directly correlate with resident observations of unkempt verges.

- **Potholes and Road Surface:** Despite the pivot to "Roads" spending, the sheer volume of reports (e.g., 3100 potholes filled in comparable jurisdictions 24) suggests that the "Maintenance Gap" is still resulting in visible degradation.

- **The "Solve Quality" Metric:** Residents are not just reporting issues; they are rating the *quality* of the fix. The focus on "efficiency" often leads to "patchwork" repairs rather than comprehensive resurfacing, leading to lower satisfaction scores regarding "Solve quality".22

#### The Mowing Cycle Reduction: Destroying The Green Floor

The most visible indicator of "Amenity Erosion" is the grass cutting schedule. This is the "canary in the coal mine" for municipal insolvency.

- **The "Low Profile" Classification Trick:** Councils manage their grass-cutting burden by classifying areas into hierarchies.

- **High Profile:** 24 cuts/year (Weekly in summer).25

- **Suburban Parks:** 15-18 cuts/year.25

- **Low Profile Local Streets:** **6 cuts/year**.25

- **The Erosion Mechanism:** To save money, councils rarely announce "we are cutting services." Instead, they reclassify a "Suburban Park" to a "Low Profile" zone, or they extend the "summer cycle" from 2 weeks to 3 weeks.

- **The Result:** A street receiving only **6 cuts per year** (once every two months) will inevitably experience periods of significant overgrowth. For a property valued at >$3m, having the adjacent verge knee-high in grass for 50% of the year is a direct violation of The Green Floor.

#### Case Study: Brisbane's "Big Heart" vs. Squalid Reality

Council minutes reveal a disconnect between the "Big City, Big Heart" narrative and the reality on the ground.

- **Homelessness and Parks:** Debates highlight the presence of "squalid and dangerous tent encampments" in Brisbane parks.26 While this is a complex social issue, from an "Amenity Erosion" perspective, the conversion of "Passive Recreation Zones" into unplanned accommodation represents a total loss of the asset's amenity value for local residents.

- **Visual Blight:** The combination of reduced mowing frequencies, "patchwork" road repairs, and social displacement in parks creates a "Visual Decay" feedback loop.

#### The Valuation Impact

According to APN Bedrock™, **60%** of a prestige asset's value is derived from its context.

- **The Decoupling:** When a council withdraws maintenance, the "Bedrock" crumbles. The private lot may be immaculate, but if the approach, the "Kerb Appeal", is degraded by "unmown verges" and "cracked footpaths," the buyer pool shrinks.

- **The Premium Loss:** In a market where buyers are paying for "lifestyle" and "perfection," the visibility of municipal neglect signals a risky investment. It suggests that the suburb is no longer a priority for the LGA, leading to a potential **10-15% discount** in realised value relative to suburbs that have maintained their "Green Floor."

5The Special Levy Escape
The "Special Levy" represents the only viable "Escape Hatch" for councils trapped in the Maintenance Squeeze. If they cannot raise general rates (due to caps) and cannot cut services further (without political revolt), they must invent new "Levies."

#### The Taxonomy Of The New Levies

The research confirms a surge in the use of "Special Rates and Charges" to bypass the general rate peg.

- **The "Environmental" Levy:** This is the most common vehicle.

- **Scenic Rim:** Introduced a **$50.00 per annum** Environmental Levy in the 2025-26 budget.9

- **Brisbane:** Utilises both an "Environmental Management and Compliance Levy" and a "Bushland Preservation Levy".4

- **Somerset:** Charges an Environmental Levy of **$86.40**.28

- **Paroo:** Charges **$78.70**.29

- **The Rationale:** These levies are justified by claiming they fund *specific* programs (e.g., "Landholder support" or "Pest management").9 However, economically, they function as a fungible revenue raiser. By funding pest management via a levy, the council frees up general rate revenue to fill the "Maintenance Gap" in roads or administration.

#### The "Tax Hike" By Another Name

For the property owner, the distinction between a "Rate Rise" and a "Levy" is semantic. The financial impact is identical: an increase in the "Holding Cost" of the asset.

- **The Burden Shift:** The introduction of these levies shifts the risk of the "Maintenance Squeeze" from the council (insolvency risk) to the ratepayer (holding cost risk).

- **Quantifying the Hike:** While the "General Rate" might only rise by 3.87% (Brisbane) or 4.5% (Scenic Rim), the *Total Tax Bill* rises by significantly more when the new levies and the **14.3% waste charge increase** 9 are factored in.

| **Council** | **Levy/Charge** | **Increase % / Amount** | **Purpose** |
| ----------- | --------------- | ----------------------- | ----------- |
| Scenic Rim | Waste Charges | +14.3% 9 | Leachate evaporation / State Levy |
| Scenic Rim | Environmental Levy | New ($50.00) 9 | Environmental programs |
| Brisbane | Pensioner Rebate | +$50 (to $1,298) 1 | *Note: This is an expense, not a levy, showing the cost of subsidies.* |
| Brisbane | General Rates | +3.87% 1 | General Operations |

#### The Limits Of The Levy Strategy

While levies offer a short-term escape, they have political limits.

- **Community Resistance:** The backlash in Scenic Rim against the 7% rise 8 proves that communities are reaching their limit.

- **Insolvency Risk:** If councils cannot continue to raise levies, they will inevitably return to service cuts. The "Levy Escape" is likely a temporary bridge, not a permanent solution to the structural deficit caused by the energy and construction cost explosion.

6Conclusion: The Resilience Trap

#### Thesis Validation

The "Maintenance Squeeze" thesis is unequivocally validated by the 2025-2026 data from Brisbane City Council and Scenic Rim Regional Council.

- **Structural Pivot Confirmed:** The financial data proves a massive reallocation of capital toward "Resilience Engineering" ($1.4bn Public Transport in Brisbane, 48:1 Road:Park ratio in Scenic Rim) at the expense of "Aesthetic Maintenance."

- **Maintenance Gap Confirmed:** The math of 23.6% energy inflation vs. 3.8-4.5% rate caps creates a structural deficit of ~1.76% per annum, necessitating service cuts.

- **Amenity Erosion Confirmed:** The reduction in mowing cycles (to as low as 6 per year), the "hold" on community projects, and the spike in resident complaints about "overgrown vegetation" in premium suburbs demonstrate the breach of The Green Floor.

#### The "Amenity Erosion" Risk Verdict

For the investor in "Prestige" assets, the risk is no longer theoretical; it is active.

- **The Resilience Trap:** Councils have successfully prioritised "Resilience" to avoid catastrophic infrastructure failure (e.g., bridge collapses). However, in doing so, they have sacrificed the "Aesthetic" layer.

- **Value Implication:** The "Bedrock" value of premium suburbs is currently being eroded by a municipal withdrawal of service. This creates a divergence: suburbs with strong private maintenance (Body Corporates, gated communities) will outperform open suburbs reliant on the "defunded" council for their streetscape amenity.

- **Future Outlook:** Expect further "Service Level Adjustments" disguised as "Strategic Alignments." The "manicured" suburban street is becoming a luxury that local government can no longer afford to provide universally. The "Green Floor" is being lowered, and with it, the passive value support for Blue Chip real estate.

7Works Cited

- 2025-26 Brisbane Budget | Brisbane City Council, accessed February 2026, [https://www.brisbane.qld.gov.au/about-council/governance-and-strategy/annual-plan-and-budget/2025-26-brisbane-budget](https://www.brisbane.qld.gov.au/about-council/governance-and-strategy/annual-plan-and-budget/2025-26-brisbane-budget)

- Work schedules ,  Grass cutting ,  Explore our Open Data | Brisbane City Council, accessed February 2026, [https://data.brisbane.qld.gov.au/explore/dataset/work-schedules-grass-cutting/](https://data.brisbane.qld.gov.au/explore/dataset/work-schedules-grass-cutting/)

- Annual Plan and Budget 2025-26 - Brisbane City Council, accessed February 2026, [https://www.brisbane.qld.gov.au/content/dam/brisbanecitycouncil/corpwebsite/about-council/documents/Annual%20Plan%20and%20Budget%202025-26.pdf.coredownload.pdf](https://www.brisbane.qld.gov.au/content/dam/brisbanecitycouncil/corpwebsite/about-council/documents/Annual%20Plan%20and%20Budget%202025-26.pdf.coredownload.pdf)

- Annual Budget 2025-26 - Brisbane City Council, accessed February 2026, [https://www.brisbane.qld.gov.au/content/dam/brisbanecitycouncil/corpwebsite/about-council/documents/Annual%20Budget%202025-26.pdf.coredownload.pdf](https://www.brisbane.qld.gov.au/content/dam/brisbanecitycouncil/corpwebsite/about-council/documents/Annual%20Budget%202025-26.pdf.coredownload.pdf)

- Annual Operational Plan Progress and Quarterly Financial Report September 2025 | Brisbane City Council, accessed February 2026, [https://www.brisbane.qld.gov.au/content/dam/brisbanecitycouncil/corpwebsite/about-council/documents/annual-operational-plan-progress-and-quarterly-financial-report-september-2025.pdf](https://www.brisbane.qld.gov.au/content/dam/brisbanecitycouncil/corpwebsite/about-council/documents/annual-operational-plan-progress-and-quarterly-financial-report-september-2025.pdf)

- Council - Minutes - Ordinary - 5 Nov 2024.docx - Brisbane City Council City Plan 2014, accessed February 2026, [https://docs.brisbane.qld.gov.au/Council%20and%20Committees/2024/11-November/5%20November%202024/Council/Council%20-%20Minutes%20-%20Ordinary%20-%205%20Nov%202024.docx](https://docs.brisbane.qld.gov.au/Council%20and%20Committees/2024/11-November/5%20November%202024/Council/Council%20-%20Minutes%20-%20Ordinary%20-%205%20Nov%202024.docx)

- Council - Minutes - 4 February 2025.docx - Brisbane City Council City Plan 2014, accessed February 2026, [https://docs.brisbane.qld.gov.au/Council%20and%20Committees/2025/02-Feb/04%20February%202025/Council/Council%20-%20Minutes%20-%204%20February%202025.docx](https://docs.brisbane.qld.gov.au/Council%20and%20Committees/2025/02-Feb/04%20February%202025/Council/Council%20-%20Minutes%20-%204%20February%202025.docx)

- Draft Corporate Plan 2025-2030 and Draft Budget 2025-2026 | Let's ..., accessed February 2026, [https://letstalk.scenicrim.qld.gov.au/draft-corporate-plan-2025-2030-and-draft-budget-2025-2026](https://letstalk.scenicrim.qld.gov.au/draft-corporate-plan-2025-2030-and-draft-budget-2025-2026)

- Scenic Rim Regional Council Draft 2025-2026 Budget, accessed February 2026, [https://letstalk.scenicrim.qld.gov.au/100048/widgets/461921/documents/307234](https://letstalk.scenicrim.qld.gov.au/100048/widgets/461921/documents/307234)

- scenic rim regional council - 2024–2025budget, accessed February 2026, [https://www.scenicrim.qld.gov.au/files/assets/public/v/1/council-services/payments-and-forms/fees-and-charges/documents/2024_2025_budget_booklet.pdf](https://www.scenicrim.qld.gov.au/files/assets/public/v/1/council-services/payments-and-forms/fees-and-charges/documents/2024_2025_budget_booklet.pdf)

- 2024–2025 - annual report - Scenic Rim Regional Council, accessed February 2026, [https://www.scenicrim.qld.gov.au/files/assets/public/v/1/our-council/administration/corporate-publications/documents/2024-2025-annual-report.pdf](https://www.scenicrim.qld.gov.au/files/assets/public/v/1/our-council/administration/corporate-publications/documents/2024-2025-annual-report.pdf)

- OPERATIONAL PLAN 2023-2024 - Scenic Rim Regional Council, accessed February 2026, [https://www.scenicrim.qld.gov.au/files/assets/public/v/1/our-council/administration/corporate-publications/documents/op_plan_2023_24_q1_report_v05.pdf](https://www.scenicrim.qld.gov.au/files/assets/public/v/1/our-council/administration/corporate-publications/documents/op_plan_2023_24_q1_report_v05.pdf)

- 01-26 Agenda - 28 January 2026 Ordinary Meeting - Banana Shire Council, accessed February 2026, [https://www.banana.qld.gov.au/files/assets/public/v/1/about-council/documents/council-minutes-and-agenda/2026/26-01-agenda-28-january-2026-ordinary-meeting_1.pdf](https://www.banana.qld.gov.au/files/assets/public/v/1/about-council/documents/council-minutes-and-agenda/2026/26-01-agenda-28-january-2026-ordinary-meeting_1.pdf)

- (Public Pack)Agenda Document for Northern Rivers Joint Organisation Board Meeting, 15/08/2025 10:00 - NSW Government, accessed February 2026, [https://www.northernriversjo.nsw.gov.au/documents/meetings/nrjo-ordinary-board-meeting-15-august-2025-agenda.pdf](https://www.northernriversjo.nsw.gov.au/documents/meetings/nrjo-ordinary-board-meeting-15-august-2025-agenda.pdf)

- Scenic Rim Regional Council 2024-2025 Budget by scenicrimregionalcouncil - Issuu, accessed February 2026, [https://issuu.com/scenicrimregionalcouncil/docs/budget_2024_2025](https://issuu.com/scenicrimregionalcouncil/docs/budget_2024_2025)

- Council Cost Index - Local Government Association of Tasmania, accessed February 2026, [https://www.lgat.tas.gov.au/tasmanian-councils/council-cost-index](https://www.lgat.tas.gov.au/tasmanian-councils/council-cost-index)

- Australian construction price outlook - Q3 2025 - Altus Group, accessed February 2026, [https://www.altusgroup.com/insights/australian-construction-material-price-outlook/](https://www.altusgroup.com/insights/australian-construction-material-price-outlook/)

- Wurundjeri Country Level 8, 570 Bourke Street | Melbourne Victoria 3000 +61 9032 1300 | esc.vi - Essential Services Commission, accessed February 2026, [https://www.esc.vic.gov.au/sites/default/files/documents/lg-highercap-advicetominister2025-26-20250102.pdf](https://www.esc.vic.gov.au/sites/default/files/documents/lg-highercap-advicetominister2025-26-20250102.pdf)

- Queensland councils back funding inquiry - LGAQ - CONNECT . INNOVATE . ACHIEVE, accessed February 2026, [https://www.lgaq.asn.au/News-and-Media/Media-Releases/Queensland-councils%C2%A0back-funding-inquiry](https://www.lgaq.asn.au/News-and-Media/Media-Releases/Queensland-councils%C2%A0back-funding-inquiry)

- Cost shift onto councils - LGAQ - CONNECT . INNOVATE . ACHIEVE, accessed February 2026, [https://www.lgaq.asn.au/Advocacy/In-Focus/Cost-shift-onto-councils](https://www.lgaq.asn.au/Advocacy/In-Focus/Cost-shift-onto-councils)

- Environmental Protection (Efficiency and Streamlining) and Other Legislation Amendment Bill 2025 - Queensland Parliament, accessed February 2026, [https://documents.parliament.qld.gov.au/com/HEIC-AF26/EPESOLAB20-0E11/submissions/00000025.pdf](https://documents.parliament.qld.gov.au/com/HEIC-AF26/EPESOLAB20-0E11/submissions/00000025.pdf)

- Community Satisfaction Index - Snap Send Solve, accessed February 2026, [https://www.snapsendsolve.com/index-2025](https://www.snapsendsolve.com/index-2025)

- Have you heard about Snap Send Solve? - Westbrook Estate, accessed February 2026, [https://westbrookestate.com.au/have-you-heard-about-snap-send-solve/](https://westbrookestate.com.au/have-you-heard-about-snap-send-solve/)

- City of Spokane releases the number of potholes they filled in 2025 - YouTube, accessed February 2026, [https://www.youtube.com/shorts/Npxz0Cqd_c4](https://www.youtube.com/shorts/Npxz0Cqd_c4)

- Turf management (mowing) | Redland City Council, accessed February 2026, [https://www.redland.qld.gov.au/Parks-venues-and-sport/Turf-management-mowing](https://www.redland.qld.gov.au/Parks-venues-and-sport/Turf-management-mowing)

- Council minutes - Brisbane City Council City Plan 2014, accessed February 2026, [https://docs.brisbane.qld.gov.au/Council%20and%20Committees/2025/03-Mar/11%20March%202025/Council/Council%20Minutes%20-%20Ordinary%20-%2018%20March%202025.docx](https://docs.brisbane.qld.gov.au/Council%20and%20Committees/2025/03-Mar/11%20March%202025/Council/Council%20Minutes%20-%20Ordinary%20-%2018%20March%202025.docx)

- Resolution of Rates and Charges 2025-26 - Brisbane City Council, accessed February 2026, [https://www.brisbane.qld.gov.au/content/dam/brisbanecitycouncil/corpwebsite/about-council/documents/Resolution%20of%20Rates%20and%20Charges%202025-26.pdf.coredownload.pdf](https://www.brisbane.qld.gov.au/content/dam/brisbanecitycouncil/corpwebsite/about-council/documents/Resolution%20of%20Rates%20and%20Charges%202025-26.pdf.coredownload.pdf)

- Somerset Budget Highlights, accessed February 2026, [https://www.somerset.qld.gov.au/files/assets/public/v/1/your-council/documents/finance-documents/eofy2526/somerset-regional-council-2025-2026-budget-highlights.pdf](https://www.somerset.qld.gov.au/files/assets/public/v/1/your-council/documents/finance-documents/eofy2526/somerset-regional-council-2025-2026-budget-highlights.pdf)

- ORDINARY COUNCIL MEETING AGENDA Tuesday 17th JUNE 2025, accessed February 2026, [https://www.paroo.qld.gov.au/files/assets/public/v/1/council/documents/meetings-agendas-and-minutes/2025/ordinary_council_agenda_17th_june_2025_final.pdf](https://www.paroo.qld.gov.au/files/assets/public/v/1/council/documents/meetings-agendas-and-minutes/2025/ordinary_council_agenda_17th_june_2025_final.pdf)

- Minutes of Special Meeting (Budget) 18 June 2025 - Somerset Regional Council, accessed February 2026, [https://www.somerset.qld.gov.au/files/assets/public/v/1/your-council/documents/finance-documents/eofy2526/special-budget-meeting-minutes-18-june-2025.pdf](https://www.somerset.qld.gov.au/files/assets/public/v/1/your-council/documents/finance-documents/eofy2526/special-budget-meeting-minutes-18-june-2025.pdf)
<!-- WP Optimize page cache - https://teamupdraft.com/wp-optimize/ - page NOT cached -->
